Fuzzy Decision of Antiquated Buildings Demolition Method

Article Preview

Abstract:

The article discussed the demolition way of antiquated buildings and the influencing factors of strategy optimization, and then it set up the index optimization system, using fuzzy analytic hierarchy process (FAHP) to determine the demolition scheme for the antiquated buildings, and ultimately selected the optimal way. Through comparison and analysis, selective demolition is the optimal choice in the demolition process of the antiquated buildings.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

2768-2772

Citation:

Online since:

November 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wan-er Chen. Old building demolition method and accident prevention[J], Construction Safety, 2002(11): 35-36(in Chinese).

Google Scholar

[2] Baoxin Chen, Mi Deng. Introduction of mechanical removing building methods[J], Construction Technology, 2004 (6): 50-51(in Chinese).

Google Scholar

[3] Zhouyuan Ye. Building demolition scheme choice and example analysis[J], Shanxi Architecture, 2010(6): 129-13(in Chinese).

Google Scholar

[4] Chibiao Hao, Ying Tie. The building dismantling and the reuse of the old building materials[J], Industrial Construction, 2012(12): 13-16(in Chinese).

Google Scholar

[5] Deconstruction: The starting point of building environmentally sustainable materials strategy[J], Industry and Environment, 2004(1): 84-88(in Chinese).

Google Scholar