Based on the AHP Method Analysis the Factors about the Quality of Construction Project

Article Preview

Abstract:

Firstly introduce the 4M1Efactors. Then apply AHP for a actual construction to weight which factor is the most important one. Finally provide direction for construction quality management in the future.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

3151-3155

Citation:

Online since:

November 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Douglas D. Communicating Design Quality Requirment for Public Sector Design, Journal of Management Engineering(2008).

Google Scholar

[2] Qi Chen: the Research of key Problems in Construction Quality Control, in: Architectural Technology and Applications(2006).

Google Scholar

[3] Maosheng Yang, Operational research . Xi 'an: Shaanxi Science and Technology Press(2011).

Google Scholar