Study of Visual Simulation for Decomposition Assembly Tower by Derrick Supported by Inner Suspension and Inner Backstay

Article Preview

Abstract:

Derrick supported by inner suspension and inner backstay group tower is a construction technique commonly used in the construction of overhead transmission lines, the locale sketch and construction technique are complex, and not conducive to the analysis of the key construction and improve the level of decision-making. Through analysis assembly tower construction technology of derrick supported by inner suspension and inner backstay, using engineering visualization design software 3ds Max, the establishment of a three-dimensional model of the tower, the pole, tackle. According to the construction process for dynamic visual simulation, accurate image show the complexity of the construction process. Visual simulation provides an intuitive basis for the construction organization design and construction scheme optimization; enhance the level of construction management.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

388-391

Citation:

Online since:

November 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Miao Qian, Huang Kexin, Xia Yongjun. Construction technology for the erection of overhead transmission tower using helicopters [J]. Construction technology, 2012, 41(379): 96-101. (In Chinese).

Google Scholar

[2] SU Hong-tian, QI Xu, WU Yun. Study on Market Demand of UHVDC Power Transmission in China [J]. Power System Technology, 2005,29(24): 1-4. (In Chinese).

Google Scholar

[3] SUN Zhu-sen, LI Zhen-yu. Study on Worksite Management Mechanism of 1000kV UHVAC Pilot Project From Southeast Shanxi via Nanyang to Jingmen[J]. Power System Technology, 2008, 32(13): 5-9. (In Chinese).

Google Scholar

[4] Lv Qiu-ping, XIAO You-qiang, ZHU Xiao-rong. Configuration Scheme on the Yunnan Power Grid Reactive Power Optimization[J]. Science technology and engineering, 2012, 12(30): 8034-8037. (In Chinese).

Google Scholar

[5] Li Qinglin, Zhou Qiang, Ling Ming, etc. Overhead transmission line tower assemble engineering handbook[S]. Beijing: China electric power press, 2007. (In Chinese).

Google Scholar

[6] ZHAO Shi-xing, LI Xin-min, ZHANG Cun-you. Construction technology and control method of derrick supported by inner suspension & outer backstay for tower erection of 750 kV transmission line[J]. Electric Power, 2009, 42(6): 89-91. (In Chinese).

Google Scholar

[7] SHI Chun-yang, LI Jie, FENG San-yong. On construction for ± 660 kV direct current iron tower by adopting free lifting pole assembly [J]. Shanxi Architecture, 2010, 36(34): 121-122. (In Chinese).

Google Scholar

[8] XU Guoqing, Lv Chaoying, XIAO Guicheng, etc. Development and Application of Monitoring System for Assembling Tower with Inside Suspension Pole[J]. Electric Power Construction, 2012, 33(9): 106-108. (In Chinese).

Google Scholar