Abstract:

Because of traditional construction method in the construction at the mouth of underground engineering has characteristics such as slow rate of construction progress and poor defense property, mouth section of underground engineering avoid incision and reinforced technology was proposed. Basic principle and construction progress of avoid incision and reinforced technology was analyzed too. Combining with engineering example, avoid incision and reinforced technology was found to be able to improve the rate of construction progress and combing disguise and defense with weak rock-soil reinforced together well at the mouth of tunnel. Through improving structure resisting force and reducing the probability of discovery on the mouth of defense engineering tunnel, the defense ability of the mouth of cave depot was improved.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

174-177

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] LI Jian-jun, JIANG Shu-ping, WU Ming-sheng. Pipe Roofing Construction Technology for Treatment of land Slip of Tuojiashan Tunnel. Technology of Highway and Transport. Aug, 2005, 21(4):151~155.

Google Scholar

[2] SHI Mangang, Key technologies study on approach to entrance of large profile tunnel in loose rock with biased load. Railway Enginnering. 2011,4:67~69.

Google Scholar

[3] WANG Hai-tao, JIA Jin-qing, YU Sheng. Preliminary support of the tunnel pipe roof mechanical behavior and parameters optimization. China Journal of Highway and Transport. 2010,23(4):78~83.

Google Scholar

[4] Gu Wenyu, Li Wei, Feng Jinying. Optimized Design of Advance Pipe-roofing for Tunnels with Flat Roof and Vertical Walls. Modern Tunnelling Technology. 2009,46(3):48~52.

Google Scholar