An Interface-Based Integrated System for Project Risk Management

Article Preview

Abstract:

According to the project interface risk classification including the physical interface risk, the contract interface risk, the tissue interface risk and the information interface risk, the integrated management model of project interface risk was put forward, which focused on the three dimensions: time dimension, relational dimension and information dimension. The project interface risk management system was developed, which consists of information subsystem, organizational subsystem, resources and support subsystem, and dynamic management subsystem. The system implements integration of project risk management from the perspective of the interface, and by using the system managers can foresee the exact location of the risk occurring or may occur.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 912-914)

Pages:

1567-1570

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Del Cano A, de la Cruz M P. Integrated methodology for project risk management [J]. Journal of Construction Engineering and Management, 2002, 128(6): 473-485.

DOI: 10.1061/(asce)0733-9364(2002)128:6(473)

Google Scholar

[2] Tah J H M, Carr V. Information modelling for a construction project risk management system [J]. Engineering Construction and Architectural Management, 2000, 7(2): 107-119.

DOI: 10.1108/eb021136

Google Scholar

[3] Chen Q. An Object Model Framework for Interface Management in Building Information Models [D]. Virginia Polytechnic Institute and State University, (2007).

Google Scholar

[4] Chen Q, Reichard G, Beliveau Y. Multiperspective approach to exploring comprehensive cause factors for interface issues[J]. Journal of Construction Engineering and Management, 2008, 134(6): 432-441.

DOI: 10.1061/(asce)0733-9364(2008)134:6(432)

Google Scholar

[5] Del Cano A, de la Cruz M P. Integrated methodology for project risk management [J]. Journal of Construction Engineering and Management, 2002, 128(6): 473-485.

DOI: 10.1061/(asce)0733-9364(2002)128:6(473)

Google Scholar