Analysis on Optimization of Dividing Construction Bid-Section Based on Safety Risks

Article Preview

Abstract:

The geological disaster prevention project is to bring the unstable and unsafe disaster bodies under control, so construction safety risk prevention of this kind of projects is of great importance. Project bid-section division is closely related to the degree of project dispersion, the frequency of monitoring visits and the project duration, and it will also have influence on project construction safety risk. According to the characteristics of geological disaster prevention projects, the paper makes a quantitative analysis of the factors that influence the construction safety. The proposed bid-section division programs are calculated and analyzed by using fuzzy entropy weight model of group decision-making, so as to determine the optimal bid-section division program based on safety risk prevention.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 912-914)

Pages:

1571-1575

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhu Zhong-rong, Theory and Practice of Geological Disaster Prevention Project Supervision[M]. Beijing: China Water Conservancy and Hydropower Press, 2012: 136~139.

Google Scholar

[2] Yin Peng, Yang Ren-shu, & Ding Ri-jia, Evaluation of Real Estate Project Construction Quality based on Entropy Method[J]. Research on Technical Economics and Management, 2013 (3): 3~7.

Google Scholar

[3] Qian Weng-di. Operations Research[M]. Beijing: Tsinghua University Press, 1990: 461~466.

Google Scholar