Urban Bluebelt Construction – Control Countermeasure of Urban Blue Line (River Project) from Line to the Whole

Article Preview

Abstract:

Since the Administrative Measures of Urban Blue Line being issued, cities compile the Blue Line project in succession, which reflects a series of problems and deficiencies. The simply method to determine the line can not meet the demands of comprehensive development of water body and land function, which causes the guiding function of the project and its construction weak, this is the problem desiderated to be discussed and solved when the compiling the urban Blue Line. This article is based on the current situation of compilation and implementation of urban Blue Line project, introduces the concepts of Bluebelt, Paste Line Rate, put forward the planning control countermeasure combined with Blue Line control and Bluebelt design, build up the Bluebelt network in macroscopic area, use Blue Line to control on meso-level, adjust urban design flexibly on micro-level, in order to provide some valuable reference for the protection and development of urban water network and compilation of Blue Line and related project.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

1586-1590

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Urban Blue Line Management Method, Ministry of Construction of the People's Republic of China, No. 145, 2005, In Chinese.

Google Scholar

[2] Xinghua Ma: Introduction of Blue Line Formulation of Inland River Main Channel (Port & Waterway Engineering, China 2002), In Chinese.

Google Scholar

[3] Yunjing Huang, Hui Yu: Several Thinking of Compiling Blue Line Planning-Take Chongqing Metropolitan Area as Example (Science & Technology Information, China 2008), In Chinese.

Google Scholar

[4] Lu Yu, Nian Ding: Analysis of Urban Blue Line Planning Method - Take Shenzhen Blue Line Planning as Example (Journal of Urban Planning, China 2010), In Chinese.

Google Scholar

[5] Lili Wu: Talk about the River Management Problem of Suburban County in Shanghai from the Control Width of River Watercourse, (Hydraulic Science and Technology and Economy, China 2011), In Chinese.

Google Scholar

[6] Fei Hou: Problem Analysis of Blue Line Planning Compilation (City Planning in Jiangsu, China 2008), In Chinese.

Google Scholar

[7] Xi Wang: Introduction to Environmental Law in the United States, edited by Wuhan University Press, China, 1992, In Chinese.

Google Scholar

[8] John Ormsbee Simonds, translated by Kongjian Yu etc: Landscape Architecture, Fourth Edition: A Manual of Land Planning and Design, edited by China Architecture & Building Press, China, 2000, p.180, In Chinese.

Google Scholar

[9] Chunxia Yang, Jiqi Lu: Make Full Use of Ecological Resources-Optimize the Organization of Waterfront Blue, Green and Red lines (Urban Planning Forum, China 2008), In Chinese.

Google Scholar

[10] SARAHA, translated by Wenkai Zhong: The Institute of Contemporary Art/Boston, edited by Editorial Board of Architecture Example Annuals. China, Architecture Example Annuals, China Architecture & Building Press, China, 2007, p.28, In Chinese.

Google Scholar