Abstract:

Because of dredging waterways, navigable rank of Beijiang Bridge needed to improve to National III level,it was necessary to remove the old Beijiang Bridge, building a new Beijiang Bridge at the same time and the same position. In view of problems as difficult to install launching nose, not enough space to remove beams,stability of the last removed box beam emerging in the process of removing, desiging and installation platform, cutting beams platforms, last-hole assisted platforms,in order to analyse force situation of the guiding beam in the process of push, using finite element software ANSYS to establish launching nose model, by simulating guiding beam at the bottom position by adding reverse force. At last, study guide beams in the up-push limit deviation technology, there was a conclusion: the building of a launching platform, cut beams platforms, last-hole assisted platforms improves the security and the stability of the construction, saves the construction space without damages in the guiding beams, forces conforming to real situation, pushing the limit deviation correction system, ensures box girder deviation in the allowed range. Key technology research in main up-push remove of Beijiang Bridge can be used for other similar bridge engineering.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

570-576

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zh.G.L. Railway Engineering. (2012) (In Chinese).

Google Scholar

[2] Shi F.Q. , et al. Engineering Blasting. ( 2009) (In Chinese).

Google Scholar

[3] Wang. J. W, and Chen. B. (2012). (In Chinese).

Google Scholar

[4] Matthew Barsottelli. Structures Congress. (2013).

Google Scholar

[5] John A. J. Constr. Eng. Manage. (2003).

Google Scholar

[6] Sarbjeet Singh, Mehrdad Mirzakashani, Abdol Hagh. Structures Congress. (2008).

Google Scholar

[7] Zheng. Y. and Tian. Z.Y. Highway. (2000)(In Chinese).

Google Scholar

[8] Yingyong Li, Jiwang Cui. East China highway. (2000)(In Chinese).

Google Scholar

[9] Zhou. Z. Road. ( 2012) (In Chinese).

Google Scholar

[10] GB 50017-2003 Code for steel structure(In Chinese).

Google Scholar