Problems and Improvement Measures of Ash Conveying System in Coal Economizer

Article Preview

Abstract:

The power economizer of 600MW boiler in ash pipeline system of ash clogging, vibration, resulting in problems of ash conveying device is not running, the causes are analyzed, put forward the optimization scheme. Transformation through a series of Economizer Ash Conveying System, effectively eliminate the ash conveying pipeline vibration, clogging problems, ensure the economizer ash conveying system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 960-961)

Pages:

485-487

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Luxin. Li, Yuesan. Qiu, Sanghu. Meng: Journal of Jilin Electric Power Vol. 3(2009). In chinese.

Google Scholar

[2] Bo. Jiang, Fuqiang. Su, Liang. Guo, Xiaoyong. Xu: Journal of Refrigeration Air Conditioning & Electric Power Machinery Vol. 2(2013). In chinese.

Google Scholar

[3] Jianguo. Liang: Journal of Electric Power Construction Vol. 7(2002). In chinese.

Google Scholar