Numerical Analysis of Air Measuring Station Location Optimization in Underground Mine Airway

Article Preview

Abstract:

The optimized air measuring station location of mine airway based on air fully developed was proposed and numerical tests were conducted with six models. The independence of air fully development and inlet velocity was analyzed which validated the models and the numerical methods. The results show that optimized air measuring station location in head entry is 132m-198m after the airway turning while 5.0m-10.1m before the airway turning in tail entry.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 960-961)

Pages:

621-624

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] G.S. Zhang: Ventilation and Safety (China University of Mining and Technology Publications, Xuzhou, 2011). (In Chinese).

Google Scholar

[2] Coal mine safety regulation expert interpretation Committee: Coal mine safety regulation expert interpretation (China University of Mining and Technology Publications, Xuzhou, 2011). (In Chinese).

Google Scholar