p.461
p.465
p.469
p.473
p.479
p.484
p.489
p.494
p.500
Application of OIL-GAS Mixting Trasportation Process in Flat 53-13 well Group
Abstract:
Through the flat 53-13 well group oil and gas mixed transportation test, the gathering radius increases from 3Km to 5km, to realize the full closed gathering. Reducing electricity consumption, according to the existing problems in the mixed transportation technology are discussed, for intermittent oil and high gas oil ratio well area, a station for reference.
Info:
Periodical:
Pages:
479-483
Citation:
Online since:
June 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: