Technical Risk Assessment of Large-Scale Construction Project Based on Triangle Whitening Weight Function

Article Preview

Abstract:

Technical risk assessment model of large-scale construction project has been established by using triangle whitening weight function of grey theory against the problems of technical risk assessment of large-scale construction project. In the end, through example verification, this model is approved to be feasible and have certain value of reference and utilization in similar problems.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 989-994)

Pages:

5294-5299

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Deng Julong: The Primary Methods of Grey System Theory (Huazhong University of Science and Technology Press, Wuhan 1990).

Google Scholar

[2] Liu Sifeng, Xie Naiming: Grey System Theory and Its Application (Science Press, Beijing 2008).

Google Scholar

[3] Chi Baoshan, Li Yongtai: Study on the R&D Technology Risk Assessment Based on the Uncertainty Theory. Journal of Academy of Armored Force Engineering. Vol. 19(2005), p.65.

Google Scholar

[4] Dai Ran: Application of Grey Triangle Whitening Weight Function in Assessment of Hydraulic Projects. ZHI HUAI. Vol. 34(2009) , p.37.

Google Scholar

[5] Zhang Xinli: Project Risk Management (China Machine Press, Beijing 2007).

Google Scholar