Evaluation of Nigerian Transmission Grid Capacity and Technical Limitations under Different Load Conditions

Article Preview

Abstract:

This paper presents performance-based study of the Nigerian Transmission Grid (NTG), having about 27 power stations, 50 transmission (330/132kV) stations and 150 bulk load centers (132/33kV). Power stations and transmission grid are designed to operate at a level close to installed capacities, to achieve high efficiency. However, due to some technical limitations and maintenance factors, not all the elements may be available at all operating times. Therefore, the available generations may not equal the installed capacity; also, the load demand (consumed) on the grid may not equal the installed transmission capacities. This study evaluates the capacity of the transmission grid considering the installed and available generation capacity and three components of transmission load: actual load demand (LD), transmission wheeling capacity (TWC) and transmission load capacity (TLC). Obtained system data were used to create virtual simulator for the transmission grid, using Power System Analysis software (NEPLAN), which uses Newton Raphson Algorithm. The results established that the power generation on the grid must be maintained at the level of installed capacity to deliver the TWC and TLC load component to mitigate the practice of rotational power transmission and distributions currently being adopted in electricity transmission and distribution in Nigeria. It was established that the transmission capacity of the current transmission network is capable of accommodating and delivering power more than the current installed generation capacity. It is recommended that efforts be geared towards improving the generation capability of the grid for efficient power transmission and distribution. Keywords: grid capacity, transmission grid, load, system collapse, voltage stability

You might also be interested in these eBooks

Info:

Periodical:

Pages:

183-190

Citation:

Online since:

July 2024

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2024 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Melodi, A. O., & Oladeji, I. R. (2017). Modelling Steady State Stability Reserve for Specific Nigerian Power Transmission Grid Expansion Plan. 2017 IEEE 3rd International Conference on Electro-Technology for National Development (NIGERCON).

DOI: 10.1109/nigercon.2017.8281962

Google Scholar

[2] Glover, J. D., Sarma, M. S., & Overbye, T. J. (2008). Power System Analysis and Design. Stamford: Cengage Learning.

Google Scholar

[3] Gupta, J. B. (2013). Electrical Pwer. New Delhi: Katari and Sons.

Google Scholar

[4] Isaac, S., Katende, J., Adebayo, S. D., & Ayokunle, A. (2014, April). Review of System Collapse Incidences on the 330-kV Nigerian National Grid. International Journal of Engineering Science Invention, 3(4), 55-59.

Google Scholar

[5] Niranjan, Natasha, Manisha, & Sujata. (2016). Voltage Collapse: Causes and Prevention. International Journal of Engineering Research & Technology, 4(2), 78-81.

Google Scholar

[6] Ogbuefi, U. C., Ugwu, C. L., & Ogbogu, N. O. (2018, April). Analysis of Nigeria Power System Voltage Collapse Incidences From 2000 To 2017. IOSR Journal of Electrical and Electronics Engineering, 13(2), 28-34.

Google Scholar

[7] TCN. (2020). Daily Broadcast. Osogbo: Transmission Company of Nigeria .

Google Scholar

[8] Oluseyi, P. O., Adelaja, T. S., & Akinbulire, T. O. (2017, january ). Analysis of the Transient Stability Limit of Nigeria's 330kV Transmission Sub-Network. Nigerian Journal of Technology, 36(1), 213-226.

DOI: 10.4314/njt.v36i1.26

Google Scholar

[9] Akinloye, B., Oshevire, P., & Epemu, A. (2016, January). Evaluation Of System Collapse Incidences On The Nigeria Power System. Journal of Multidisciplinary Engineering Science and Technology (JMEST), 3(1), 3707-3711.

Google Scholar

[10] Hassan, H., Haes, A., & Mohamad, E. H.-G. (2019, february 20). A Survey on Power System Blackout and Cascading Events: Research Motivations and Challenges. energy MDPI, 12(682), 4-7.

DOI: 10.3390/en12040682

Google Scholar

[11] Itodo, E. S., & Melodi, A. O. (2020). Techno-Economical Feasibility of Power Supply to Passive Zones of Nigeria's 330 kV Power Transmission Grid. 2020 IEEE PES/IAS PowerAfrica, Nairobi, Kenya (pp.1-5). Nairobi: IEEE.

DOI: 10.1109/powerafrica49420.2020.9219970

Google Scholar

[12] Melodi, A. O., & Aremu, S. O. (2020). Prospects of Nigeria's Power Transmission Grid Capacity on Macro Hydropower Generation. 11th international conference on energy and power systems operation and planning (ICPSOP) (pp.36-41). Abuja: ICPSOP USA.

Google Scholar