Comparative Analysis of Prefabricated and Conventional Construction Methods: A Systematic Review Using PRISMA on Cost, Time, Quality, and Sustainability

Article Preview

Abstract:

This literature review compares the efficiency of prefabricated and conventional construction methods based on the project management scope triangle, which includes cost, schedule, quality, and sustainability. The study employs the PRISMA methodology to systematically identify, screen, and analyze relevant literature from multiple academic databases. The findings indicate that prefabrication provides notable advantages, including cost savings, reduced construction time, improved quality control, and enhanced sustainability. Prefabrication minimizes material waste, lowers labor costs, and shortens project schedules through parallel production processes. However, it requires substantial initial investment and careful logistical planning. In contrast, conventional construction methods offer greater flexibility in accommodating design changes but often incur higher costs, longer project durations, and variable quality outcomes. The insights from this review can assist construction industry stakeholders in making informed decisions regarding the adoption of prefabrication techniques. By understanding the benefits and challenges of each method, project managers, architects, and developers can optimize project performance and overall efficiency. This review contributes to existing knowledge by providing a systematic comparison of prefabricated and conventional construction methods across critical dimensions, while emphasizing the growing importance of prefabrication in achieving cost-effective, timely, high-quality, and sustainable construction projects.

You might also be interested in these eBooks

Info:

Periodical:

Engineering Headway (Volume 39)

Pages:

301-316

Citation:

Online since:

July 2026

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2026 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] J. L. Hao, W. Zhao, G. Gong, W. Ma, L. Li, and Y. Zhang, "Catalyzing sustainability through prefabrication: Integrating BIM-LCA for assessing embodied carbon in timber formwork waste," Sustainable Chemistry and Pharmacy, vol. 41, no. February, p.101698, 2024.

DOI: 10.1016/j.scp.2024.101698

Google Scholar

[2] Y. Zhang, Z. Lei, S. Han, A. Bouferguene, and M. Al-Hussein, "Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance," Journal of Construction Engineering and Management, vol. 146, no. 9, p.1–16, 2020.

DOI: 10.1061/(asce)co.1943-7862.0001909

Google Scholar

[3] J. Jeong et al., "An integrated evaluation of productivity, cost and CO2 emission between prefabricated and conventional columns," Journal of Cleaner Production, vol. 142, p.2393–2406, 2017.

DOI: 10.1016/j.jclepro.2016.11.035

Google Scholar

[4] P. Sharafi, M. Mortazavi, B. Samali, and H. Ronagh, "Interlocking system for enhancing the integrity of multi-storey modular buildings," Automation in Construction, vol. 85, no. March 2017, p.263–272, 2018.

DOI: 10.1016/j.autcon.2017.10.023

Google Scholar

[5] M. Yuan, Z. Li, X. Li, L. Li, S. Zhang, and X. Luo, "How to promote the sustainable development of prefabricated residential buildings in China: A tripartite evolutionary game analysis," Journal of Cleaner Production, vol. 349, no. August 2021, p.131423, 2022.

DOI: 10.1016/j.jclepro.2022.131423

Google Scholar

[6] C. Z. Li, J. Hong, F. Xue, G. Q. Shen, X. Xu, and M. K. Mok, "Schedule risks in prefabrication housing production in Hong Kong: a social network analysis," Journal of Cleaner Production, vol. 134, no. Part B, p.482–494, 2016.

DOI: 10.1016/j.jclepro.2016.02.123

Google Scholar

[7] V. W. Y. Tam, I. W. H. Fung, M. C. P. Sing, and S. O. Ogunlana, "Best practice of prefabrication implementation in the Hong Kong public and private sectors," Journal of Cleaner Production, vol. 109, p.216–231, 2015.

DOI: 10.1016/j.jclepro.2014.09.045

Google Scholar

[8] L. Jaillon and C. S. Poon, "Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study," Construction Management and Economics, vol. 26, no. 9, p.953–966, 2008.

DOI: 10.1080/01446190802259043

Google Scholar

[9] M. Arashpour, A. Heidarpour, A. Akbar Nezhad, Z. Hosseinifard, N. Chileshe, and R. Hosseini, "Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality," Construction Management and Economics, vol. 38, no. 6, p.502–514, 2020.

DOI: 10.1080/01446193.2019.1616789

Google Scholar

[10] T. Tan, K. Chen, F. Xue, and W. Lu, "Barriers to Building Information Modeling (BIM) implementation in China's prefabricated construction: An interpretive structural modeling (ISM) approach," Journal of Cleaner Production, vol. 219, p.949–959, 2019.

DOI: 10.1016/j.jclepro.2019.02.141

Google Scholar

[11] J. J. Fan, D. C. Feng, G. Wu, S. Hou, and Y. Lu, "Experimental study of prefabricated RC column-foundation assemblies with two different connection methods and using large-diameter reinforcing bars," Engineering Structures, vol. 205, no. December 2019, p.110075, 2020.

DOI: 10.1016/j.engstruct.2019.110075

Google Scholar

[12] C. Mao, Q. Shen, W. Pan, and K. Ye, "Major Barriers to Off-Site Construction: The Developer's Perspective in China," Journal of Management in Engineering, vol. 31, no. 3, 2015.

DOI: 10.1061/(asce)me.1943-5479.0000246

Google Scholar

[13] Z. Li, G. Q. Shen, and M. Alshawi, "Measuring the impact of prefabrication on construction waste reduction: An empirical study in China," Resources, Conservation and Recycling, vol. 91, p.27–39, 2014.

DOI: 10.1016/j.resconrec.2014.07.013

Google Scholar

[14] I. Atta, E. S. Bakhoum, and M. M. Marzouk, "Digitizing material passport for sustainable construction projects using BIM," Journal of Building Engineering, vol. 43, no. June, p.103233, 2021.

DOI: 10.1016/j.jobe.2021.103233

Google Scholar

[15] M. Wasim, T. M. Han, H. Huang, M. Madiyev, and T. D. Ngo, "An approach for sustainable, cost-effective and optimised material design for the prefabricated non-structural components of residential buildings," Journal of Building Engineering, vol. 32, no. May, p.101474, 2020.

DOI: 10.1016/j.jobe.2020.101474

Google Scholar

[16] S. T. Abey and K. B. Anand, "Embodied Energy Comparison of Prefabricated and Conventional Building Construction," Journal of The Institution of Engineers (India): Series A, vol. 100, no. 4, p.777–790, 2019.

DOI: 10.1007/s40030-019-00394-8

Google Scholar

[17] S. Banihashemi, A. Tabadkani, and M. R. Hosseini, "Integration of parametric design into modular coordination: A construction waste reduction workflow," Automation in Construction, vol. 88, no. December 2017, p.1–12, 2018.

DOI: 10.1016/j.autcon.2017.12.026

Google Scholar

[18] N. Sharma and B. Laishram, "Understanding the relevance and impact of the cost of quality in the construction industry: a systematic literature review using PRISMA," Construction Innovation, 2024.

DOI: 10.1108/CI-08-2023-0197

Google Scholar

[19] A. Leles, L. Zaina, J. R. Cardoso, and L. Member, "Challenge-Based Learning for Competency Development in Engineering Education, a Prisma-Based Systematic Literature Review," IEEE Transactions on Education, vol. PP, p.1–12, 2024.

DOI: 10.1109/TE.2024.3417908

Google Scholar

[20] S. Azhar, M. Y. Lukkad, and I. Ahmad, "An Investigation of Critical Factors and Constraints for Selecting Modular Construction over Conventional Stick-Built Technique," International Journal of Construction Education and Research, vol. 9, no. 3, p.203–225, 2013.

DOI: 10.1080/15578771.2012.723115

Google Scholar

[21] I. Y. Wuni, G. Q. Shen, R. Osei-Kyei, and S. Agyeman-Yeboah, "Modelling the critical risk factors for modular integrated construction projects," International Journal of Construction Management, vol. 22, no. 11, p.2013–2026, 2022.

DOI: 10.1080/15623599.2020.1763049

Google Scholar

[22] E. M. Generalova, V. P. Generalov, and A. A. Kuznetsova, "Modular Buildings in Modern Construction," Procedia Engineering, vol. 153, p.167–172, 2016.

DOI: 10.1016/j.proeng.2016.08.098

Google Scholar

[23] W. Lu, W. M. W. Lee, F. Xue, and J. Xu, "Revisiting the effects of prefabrication on construction waste minimization: A quantitative study using bigger data," Resources, Conservation and Recycling, vol. 170, no. December 2020, p.105579, 2021.

DOI: 10.1016/j.resconrec.2021.105579

Google Scholar

[24] D. Lopez and T. M. Froese, "Analysis of Costs and Benefits of Panelized and Modular Prefabricated Homes," Procedia Engineering, vol. 145, p.1291–1297, 2016.

DOI: 10.1016/j.proeng.2016.04.166

Google Scholar

[25] P. Piroozfar, H. Altan, and O. Popovic-Larsen, "Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction," Architectural Engineering and Design Management, vol. 8, no. 1, p.55–75, 2012.

DOI: 10.1080/17452007.2012.650935

Google Scholar

[26] I. Meireles, M. Martín-Gamboa, V. Sousa, A. Kalthoum, and J. Dufour, "Comparative environmental life cycle assessment of partition walls: Innovative prefabricated systems vs conventional construction," Cleaner Environmental Systems, vol. 12, no. March, 2024.

DOI: 10.1016/j.cesys.2024.100179

Google Scholar

[27] A. O. Sojobi and K. M. Liew, "Multi-objective optimization of high-performance bio-inspired prefabricated composites for sustainable and resilient construction," Composite Structures, vol. 279, no. August 2021, p.114732, 2022.

DOI: 10.1016/j.compstruct.2021.114732

Google Scholar

[28] T. Gunawardena, T. Ngo, P. Mendis, L. Aye, and R. Crawford, "Gunawardena-vd-2014-Time Efficient Post-Disaster Housing," 2014.

DOI: 10.1108/ohi-03-2014-b0007

Google Scholar

[29] X. Cao, X. Li, Y. Zhu, and Z. Zhang, "A comparative study of environmental performance between prefabricated and traditional residential buildings in China," Journal of Cleaner Production, vol. 109, p.131–143, 2015.

DOI: 10.1016/j.jclepro.2015.04.120

Google Scholar

[30] V. Puri, P. Chakrabortty, S. Anand, and S. Majumdar, "Bamboo reinforced prefabricated wall panels for low-cost housing," Journal of Building Engineering, vol. 9, no. November 2016, p.52–59, 2017.

DOI: 10.1016/j.jobe.2016.11.010

Google Scholar

[31] C. Mao, Q. Shen, L. Shen, and L. Tang, "Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects," Energy and Buildings, vol. 66, p.165–176, 2013.

DOI: 10.1016/j.enbuild.2013.07.033

Google Scholar

[32] Y. Ji, K. Li, G. Liu, A. Shrestha, and J. Jing, "Comparing greenhouse gas emissions of precast in-situ and conventional construction methods," Journal of Cleaner Production, vol. 173, p.124–134, 2018.

DOI: 10.1016/j.jclepro.2016.07.143

Google Scholar

[33] S. Navaratnam, A. Satheeskumar, G. Zhang, K. Nguyen, S. Venkatesan, and K. Poologanathan, "The challenges confronting the growth of sustainable prefabricated building construction in Australia: Construction industry views," Journal of Building Engineering, vol. 48, no. December 2021, p.103935, 2022.

DOI: 10.1016/j.jobe.2021.103935

Google Scholar

[34] H. Pervez, Y. Ali, and A. Petrillo, "A quantitative assessment of greenhouse gas (GHG) emissions from conventional and modular construction: A case of developing country," Journal of Cleaner Production, vol. 294, p.126210, 2021.

DOI: 10.1016/j.jclepro.2021.126210

Google Scholar

[35] M. Kamali, K. Hewage, and R. Sadiq, "Conventional versus modular construction methods: A comparative cradle-to-gate LCA for residential buildings," Energy and Buildings, vol. 204, 2019.

DOI: 10.1016/j.enbuild.2019.109479

Google Scholar

[36] J. Monahan and J. C. Powell, "An embodied carbon and energy analysis of modern methods of construction in housing: A case study using a lifecycle assessment framework," Energy and Buildings, vol. 43, no. 1, p.179–188, 2011.

DOI: 10.1016/j.enbuild.2010.09.005

Google Scholar

[37] A. N. Baldwin, L. Y. Shen, C. S. Poon, S. A. Austin, and I. Wong, "Modelling design information to evaluate pre-fabricated and pre-cast design solutions for reducing construction waste in high rise residential buildings," Automation in Construction, vol. 17, no. 3, p.333–341, 2008.

DOI: 10.1016/j.autcon.2007.05.013

Google Scholar

[38] T. O. Adekunle and M. Nikolopoulou, "Thermal comfort, summertime temperatures and overheating in prefabricated timber housing," Building and Environment, vol. 103, p.21–35, 2016.

DOI: 10.1016/j.buildenv.2016.04.001

Google Scholar

[39] V. Tavares, N. Lacerda, and F. Freire, "Embodied energy and greenhouse gas emissions analysis of a prefabricated modular house: The 'Moby' case study," Journal of Cleaner Production, vol. 212, p.1044–1053, 2019.

DOI: 10.1016/j.jclepro.2018.12.028

Google Scholar

[40] A. W. Hammad, A. Akbarnezhad, P. Wu, X. Wang, and A. Haddad, "Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors," Journal of Cleaner Production, vol. 228, p.1264–1281, 2019.

DOI: 10.1016/j.jclepro.2019.04.150

Google Scholar

[41] J. Molavi and D. L. Barral, "A Construction Procurement Method to Achieve Sustainability in Modular Construction," Procedia Engineering, vol. 145, p.1362–1369, 2016.

DOI: 10.1016/j.proeng.2016.04.201

Google Scholar

[42] W. M. S. Wan Omar, J. H. Doh, K. Panuwatwanich, and D. Miller, "Assessment of the embodied carbon in precast concrete wall panels using a hybrid life cycle assessment approach in Malaysia," Sustainable Cities and Society, vol. 10, p.101–111, 2014.

DOI: 10.1016/j.scs.2013.06.002

Google Scholar

[43] Y. Zhao, L. Liu, and M. Yu, "Comparison and analysis of carbon emissions of traditional, prefabricated, and green material buildings in materialization stage," Journal of Cleaner Production, vol. 406, no. December 2022, p.137152, 2023.

DOI: 10.1016/j.jclepro.2023.137152

Google Scholar

[44] G. Tumminia, F. Guarino, S. Longo, M. Ferraro, M. Cellura, and V. Antonucci, "Life cycle energy performances and environmental impacts of a prefabricated building module," Renewable and Sustainable Energy Reviews, vol. 92, no. May, p.272–283, 2018.

DOI: 10.1016/j.rser.2018.04.059

Google Scholar

[45] L. Aye, T. Ngo, R. H. Crawford, R. Gammampila, and P. Mendis, "Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules," Energy and Buildings, vol. 47, p.159–168, 2012.

DOI: 10.1016/j.enbuild.2011.11.049

Google Scholar

[46] M. M. Rahman, "Barriers of Implementing Modern Methods of Construction," Journal of Management in Engineering, vol. 30, no. 1, p.69–77, 2014.

DOI: 10.1061/(asce)me.1943-5479.0000173

Google Scholar

[47] M. R. A. Kadir, W. P. Lee, M. S. Jaafar, S. M. Sapuan, and A. A. A. Ali, "Construction performance comparison between conventional and industrialised building systems in Malaysia," Structural Survey, vol. 24, no. 5, p.412–424, 2006.

DOI: 10.1108/02630800610712004

Google Scholar

[48] T. Kim, Y. woo Kim, and H. Cho, "Dynamic production scheduling model under due date uncertainty in precast concrete construction," Journal of Cleaner Production, vol. 257, p.120527, 2020.

DOI: 10.1016/j.jclepro.2020.120527

Google Scholar

[49] W. Lu, K. Chen, F. Xue, and W. Pan, "Searching for an optimal level of prefabrication in construction: An analytical framework," Journal of Cleaner Production, vol. 201, p.236–245, 2018.

DOI: 10.1016/j.jclepro.2018.07.319

Google Scholar

[50] A. Mohsen Alawag et al., "Critical Success Factors Influencing Total Quality Management In Industrialised Building System: A Case Of Malaysian Construction Industry," Ain Shams Engineering Journal, vol. 14, no. 2, p.101877, 2023.

DOI: 10.1016/j.asej.2022.101877

Google Scholar

[51] R. Yunus and J. Yang, "Critical sustainability factors in industrialised building systems," Construction Innovation, vol. 12, no. 4, p.447–463, 2012.

DOI: 10.1108/14714171211272216

Google Scholar

[52] V. W. Y. Tam, C. M. Tam, J. K. W. Chan, and W. C. Y. Ng, "Cutting Construction Wastes by Prefabrication," International Journal of Construction Management, vol. 6, no. 1, p.15–25, 2006.

DOI: 10.1080/15623599.2006.10773079

Google Scholar

[53] Z. Gyurkó, B. Jankus, O. Fenyvesi, and R. Nemes, "Sustainable applications for utilization the construction waste of aerated concrete," Journal of Cleaner Production, vol. 230, p.430–444, 2019.

DOI: 10.1016/j.jclepro.2019.04.357

Google Scholar

[54] M. F. Musa, M. F. Mohammad, R. Mahbub, and M. R. Yusof, "Enhancing the Quality of Life by Adopting Sustainable Modular Industrialised Building System (IBS) in the Malaysian Construction Industry," Procedia - Social and Behavioral Sciences, vol. 153, p.79–89, 2014.

DOI: 10.1016/j.sbspro.2014.10.043

Google Scholar

[55] S. Durdyev and S. Ismail, "Offsite Manufacturing in the Construction Industry for Productivity Improvement," EMJ - Engineering Management Journal, vol. 31, no. 1, p.35–46, 2019.

DOI: 10.1080/10429247.2018.1522566

Google Scholar

[56] J. Hong, G. Q. Shen, C. Mao, Z. Li, and K. Li, "Life-cycle energy analysis of prefabricated building components: An input-output-based hybrid model," Journal of Cleaner Production, vol. 112, no. 2016, p.2198–2207, 2016.

DOI: 10.1016/j.jclepro.2015.10.030

Google Scholar

[57] J. Wang and J. Dai, "Sustainable supply chain management practices and performance," Industrial Management and Data Systems, vol. 118, no. 1, p.2–21, 2018.

DOI: 10.1108/IMDS-12-2016-0540

Google Scholar

[58] W. Lu and H. Yuan, "Investigating waste reduction potential in the upstream processes of offshore prefabrication construction," Renewable and Sustainable Energy Reviews, vol. 28, p.804–811, 2013.

DOI: 10.1016/j.rser.2013.08.048

Google Scholar

[59] S. Pheng Low, "Quantifying the relationships between buildability, structural quality and productivity in construction," Structural Survey, vol. 19, no. 2, p.106–112, 2001.

DOI: 10.1108/EUM0000000005627

Google Scholar

[60] B. G. Hwang, M. Shan, and K. Y. Looi, "Key constraints and mitigation strategies for prefabricated prefinished volumetric construction," Journal of Cleaner Production, vol. 183, p.183–193, 2018.

DOI: 10.1016/j.jclepro.2018.02.136

Google Scholar

[61] M. Arashpour, V. Kamat, Y. Bai, R. Wakefield, and B. Abbasi, "Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction," Automation in Construction, vol. 95, no. February, p.1–9, 2018.

DOI: 10.1016/j.autcon.2018.07.027

Google Scholar

[62] K. H. I. Wasana, S. Gunatilake, and M. F. F. Fasna, "Performance Comparison of Prefabricated Building Construction Projects vs. Traditional On-site Construction Projects," MERCon 2019 - Proceedings, 5th International Multidisciplinary Moratuwa Engineering Research Conference, p.169–174, 2019.

DOI: 10.1109/MERCon.2019.8818676

Google Scholar

[63] S. Jang and G. Lee, "Process, productivity, and economic analyses of BIM–based multi-trade prefabrication—A case study," Automation in Construction, vol. 89, no. March 2017, p.86–98, 2018.

DOI: 10.1016/j.autcon.2017.12.035

Google Scholar

[64] V. Tavares, N. Soares, N. Raposo, P. Marques, and F. Freire, "Prefabricated versus conventional construction: Comparing life-cycle impacts of alternative structural materials," Journal of Building Engineering, vol. 41, no. October 2020, p.102705, 2021.

DOI: 10.1016/j.jobe.2021.102705

Google Scholar

[65] L. Z. Luo, C. Mao, L. Y. Shen, and Z. D. Li, "Risk factors affecting practitioners' attitudes toward the implementation of an industrialized building system a case study from China," Engineering, Construction and Architectural Management, vol. 22, no. 6, p.622–643, 2015.

DOI: 10.1108/ECAM-04-2014-0048

Google Scholar

[66] V. W. Y. Tam and J. J. L. Hao, "Prefabrication as a mean of minimizing construction waste on site," International Journal of Construction Management, vol. 14, no. 2, p.113–121, 2014.

DOI: 10.1080/15623599.2014.899129

Google Scholar

[67] M. F. Tchidi, Z. He, and Y. B. Li, "Process and quality improvement using Six Sigma in construction industry," Journal of Civil Engineering and Management, vol. 18, no. 2, p.158–172, 2012.

DOI: 10.3846/13923730.2012.657411

Google Scholar

[68] W. Zhang, M. W. Lee, L. Jaillon, and C. S. Poon, "The hindrance to using prefabrication in Hong Kong's building industry," Journal of Cleaner Production, vol. 204, no. 2018, p.70–81, 2018.

DOI: 10.1016/j.jclepro.2018.08.190

Google Scholar

[69] A. Tighnavard Balasbaneh and B. S. Ramadan, "Integrating three pillars of sustainability for evaluating the modular construction building," Construction Innovation, vol. 2021, 2024.

DOI: 10.1108/CI-01-2024-0002

Google Scholar

[70] N. A. A. Bari, N. A. Abdullah, R. Yusuff, N. Ismail, and A. Jaapar, "Environmental Awareness and Benefits of Industrialized Building Systems (IBS)," Procedia - Social and Behavioral Sciences, vol. 50, no. July, p.392–404, 2012.

DOI: 10.1016/j.sbspro.2012.08.044

Google Scholar

[71] Z. Wang, H. Hu, and J. Gong, "Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components," Automation in Construction, vol. 86, no. November 2017, p.69–80, 2018.

DOI: 10.1016/j.autcon.2017.10.026

Google Scholar

[72] J. Jayawardana, M. Sandanayake, J. A. S. C. Jayasinghe, A. K. Kulatunga, and G. Zhang, "A comparative life cycle assessment of prefabricated and traditional construction – A case of a developing country," Journal of Building Engineering, vol. 72, no. April, p.106550, 2023.

DOI: 10.1016/j.jobe.2023.106550

Google Scholar