Modeling and Optimization a Production/Maintenance Integrated Planning

Article Preview

Abstract:

This study is on the integrated planning problem of maintenance and production within the frame work of a system subject to periodic preventive replacements with minimal repairs in case of unplanned failures. A model was developed using the overall cost by considering the interdependence between the maintenance plan and the production schedule. The overall cost contains two parts: the costs of launching a product, production, storage and breaking on the demand and the preventive and corrective maintenance costs for multi-periods and multi-products systems. The purpose of this integration is to find simultaneously the optimal cycle T at which the preventive maintenance takes place and the optimal values of lot-size by adding the setup time constraint. Using the mixed integer linear programming these optimal values minimize the total cost over a finite horizon. The results show that the proposed model performs quite well and opens new research direction for future improvements.

You might also be interested in these eBooks

Info:

Pages:

169-181

Citation:

Online since:

January 2017

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2017 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] B. Karimia, S.M.T. Fatemi Ghomia, J.M. Wilsonb, The capacitated lot sizing problem: a review of models and algorithms, Omega the International Journal of Management Sciences 31 (2003) 365-378.

DOI: 10.1016/s0305-0483(03)00059-8

Google Scholar

[2] G. ETTAYE, A. Elbarkany, A. Elkhalfi, The integration of maintenance plans and production scheduling for a degradable multi-state system: A literature review, International journal of productivity and quality management. 19 (2016) 74-97.

DOI: 10.1504/ijpqm.2016.078017

Google Scholar

[3] J. Orlicky, The Successful Computer System: it's planning development and Management in a Business Enterprise. New York: McGraw-Hill, 1968, pp.162-168.

Google Scholar

[4] M.A. Selsouli, Modélisation et résolution d'un problème de la planification conjointe de production et de maintenance. Thèse De Doctorat, l'Université De Nantes, (2011).

DOI: 10.4000/amades.1216

Google Scholar

[5] H. M. Wagner, T. M. Whitin, A dynamic version of the economic lot size model, Management Science. 5 (1958) 89-96.

DOI: 10.1287/mnsc.5.1.89

Google Scholar

[6] A.S. Manne, Programming of economic lot-sizes, Management Science. 4 (1958) 115- 135.

Google Scholar

[7] E. Aghezzaf, M. Jamal, D. Ait-Kadi, An integrated production and preventive maintenance planning model, European Journal of Operational Research. 181 (2007) 679-685.

DOI: 10.1016/j.ejor.2006.06.032

Google Scholar

[8] E. Aghezzaf, C. Sitompul, N. Najid, Integrated production planning and preventive maintenance in deteriorating production systems, Information Sciences. 178 (2008) 3382-3392.

DOI: 10.1016/j.ins.2008.05.007

Google Scholar

[9] M. Nourelfath, E. Chatelet, Integrating production, inventory and maintenance planning for a parallel system with dependent components, Reliability Engineering and System Safety. 101 (2012) 59-66.

DOI: 10.1016/j.ress.2012.02.001

Google Scholar

[10] M. Nourelfath, M.C. Fitouhi, M. Machani, An Integrated Model for Production and Preventive Maintenance Planning in Multi-State Systems, IEEE Transactions on Reliability. 59 (2010) 496-506.

DOI: 10.1109/tr.2010.2056412

Google Scholar

[11] F. Yalaoui, K. Chabbi, A. Yalaoui, Integrated production planning and preventive maintenance in deteriorating production systems, Information Sciences. 278 (2014) 841-861.

DOI: 10.1016/j.ins.2014.03.097

Google Scholar

[12] N. Najid, M.A. Selsouli, A. Mohafid, An integrated production and maintenance planning model with time windows and shortage cost, International Journal of Production Research. 49 (2011) 2265-2283.

DOI: 10.1080/00207541003620386

Google Scholar

[13] D. Bergeron, Couplage de la simulation et de l'optimisation pour une planification intégrée de la production et de la maintenance des systèmes de production flexibles. La maîtrise en génie industriel, Université du Québec à Trois-Rivières, (2012).

DOI: 10.2307/j.ctv30dxwxv.64

Google Scholar