[1]
S-H Lee, J-H Lee, M-H Han, W-H Lee, and H-D Jeong, Undestructive test of cable joint by PD detection, Proc. Of the KSNT Spring Conf. 2002, pp.158-163, (2002).
Google Scholar
[2]
E. Gulski, F. Wester, J. Smit, P. Seitz and M Turner, PD Detection in Power Cables Using Oscillating Wave Test System, IEEE international. Symposium on Electrical Insulation, pp.444-447, (2000).
DOI: 10.1109/elinsl.2000.845544
Google Scholar
[3]
J-T Kim, N-J Kim, J-S Lee, and J-Y Ku, Partial discharge detection for the power cable using AC and oscillating wave voltage, Trans. of KIEE, vol. 48C, no. 5, pp.247-252, (1999).
Google Scholar
[4]
U-Y Lee, K-H Kim, I-G Song, J-Y Kim, and S-J Kim, Development of the PD detector for 23kV pre-modeled cable joints under the normal operating condition, Trans. of KIEE, vol. 47, no. 3, pp.358-363, (1998).
Google Scholar
[5]
Dirk Russwurm, On-site partial discharge monitoring useing the differential Lemke Prove LDP-5 and its accessories, Proceeding of HV testing, monitoring and Diagnostics wrokshop, pp.8-1~8-11, (2000).
Google Scholar
[6]
E. Lemke, T. Strehl, and D. Russwurm, New developments in the field of PD detection and location in power cables under on-site condition, " Proceedings of the 1999 11th international symposium on , High voltage engineering , p.106. s14-111. s14, (1999).
DOI: 10.1049/cp:19990897
Google Scholar
[7]
E. Lemke, T. Strehl, and W. Mosch, Advanced partial discharge diagnostic of MV power cable system using oscillating wave test system, IEEE Trans. on Electrical Insulation, vol. 26, no. 3, (1991).
DOI: 10.1109/57.833657
Google Scholar
[8]
F.H. Kreuger, Industrial High Voltage, pp.84-86 , Delft University Press, Netherlands.
Google Scholar