Comparison Optimization Analysis of the Location of Power House under Complex Geological Structure

Article Preview

Abstract:

The power house of Yantan extended hydropower project, with complex geological conditions such as fault f211 below the power house and quartzite on top of it, is a huge underground cavern with large span and high wall. In order to evaluate the stability of the power house surrounded by such complex geological structure, the numerical simulation excavation of power house with different location schemes were studied by the elasto-plastic 2D FEM method. The deformation and evolutive process of the stress with the progress of excavation were analyzed. On the condition ensuring the whole stability of surrounding rock mass, comparison optimization analyses were conducted on the power house location scheme. The rational location scheme was demonstrated. The final analyses results show that: (1) The mechanical properties of quartzite and its relative location to the power house has no obvious influence to the stability of surrounding rock mass.(2) The f211 is the main bad geological structure which affect the stability of power house. (3) The case of moving 10m upward of power house is the most rational scheme for the whole stability of power house. (4) The Supporting measures, which would has an obvious effect in controlling the influence on the stability of surrounding rock mass by weak geological structure, are suggested at the out-crop of f211.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 306-308)

Pages:

1455-1460

Citation:

Online since:

March 2006

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2006 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] S.C. Li, W.S. Zhu, W.Z. Chen et al. Study on Stability and Anchoring Effect of Jointedrock Mass of an Power Powerhouse. Rock and Soil Mechanics. 24(2003): p.510.

Google Scholar

[2] X.T. Feng, H.G. An. Hybrid Intelligent Method Optimization of a Soft Rock Replacement Scheme for a Large Cavern Excavated in Alternate Hard and Soft Rock Strata[J], International Journal of Rock Mechanics and Mining Sciences, 41(2004): p.655.

DOI: 10.1016/j.ijrmms.2004.01.005

Google Scholar

[3] W.Z. Chen, W.S. Zhu, S.C. Li et al. Optimization of the Construction Sequence and Anchoring Parameters in the Large Power Cavern Excavation of Shuibuya Project. Chinese Journal of Rock Mechanics and Engineering. Vol. 22(2003): p.1623.

Google Scholar

[4] C.T. Deng, T.G. Wei. Study on Reasonable Excavation Procedure of Power Cavities of Tianhuangping Pumped Storage Power Station[J], Journal of Hohai University, 1999, 27(5): p.68.

Google Scholar

[5] X.C. Xue, W.B. Yang, A Calculation Method for Optimizing the Shape of Section of a Tunnel[J], Chinese Journal of Geotechnical Engineering, 1999, 21(2): p.144.

Google Scholar

[6] W.S. Zhu, X.J. Li, Y.S. Guo et al, Systematical Study on Stability of Large Power Houses[J], Chinese Journal of Rock Mechanics and Engineering, 2004, 23(10): p.1689.

Google Scholar