Optimal Control of Large Flood of Ankang Reservoir

Article Preview

Abstract:

Located in the upper stream of the Hanjiang River, the Ankang Reservoir is a large hydro-junction mainly for electric power generation as well as for flood prevention and shipping. Rainstorms in the Hanjiang River in summer have high occurrence with concentrated floods characterized by sudden surge and sudden fall. Considering staggering the Hanjiang River and the Yuehe River flood peaks, on the premise of ensuring the dam safety and meeting the flood prevention requirements of Ankang Town, this Thesis establishes the mathematical model for the Ankang Reservoir large flood multi-objective optimal deployment, adopts the progressive optimality algorithm (POA) to solve the model to work out the optimal control with the inconsistent objectives of flood prevention and power generation during large flood and gives examples. The result shows that the mathematical model is workable and practicable and the solution methods are rapid and accurate.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 467-469)

Pages:

625-628

Citation:

Online since:

February 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Tian Fengwei, Guo Yongping and Xie jiancang: Strategic Research of water resources comprehensive development on Hanjiang upstream (Shaanxi Science & technology Press, Xi'an 1998).

Google Scholar

[2] Huang Qiang and Shen Jin : Multi-Purpose and Multi-Model of Joint Reservoir Operation as Well as Decomposition and Coordination Algorithm. Systems Engineering –Theory & Practice Vol. 1 (1997), pp.75-82.

Google Scholar

[3] SS. Schwartz : Multiobjective Management of Potomac River Consumptive Use. Water Resources Planning and Management Vol. 126 (2000), pp.277-287.

DOI: 10.1061/(asce)0733-9496(2000)126:5(277)

Google Scholar

[4] S MOHAN, and DM RAIPURE : Multiobjective Analysis of Multireservoir System. Journal of Water Resources Planning and Management Vol. 118 (1992), pp.356-370.

DOI: 10.1061/(asce)0733-9496(1992)118:4(356)

Google Scholar

[5] Wang YC, J Yoshitani and K Fukami : Stochastic Multiobjective Optimization of Reservoirs in Parallel. Hydrological Processes Vol. 19 (2005), pp.3551-3567.

DOI: 10.1002/hyp.5845

Google Scholar

[6] H. Raman and V. Chandramouli : Deriving A General Operating Policy for Reservoirs Using Neural Network . Journal of Water Resources Planning and Management Vol. 122 (1996), pp.342-347.

DOI: 10.1061/(asce)0733-9496(1996)122:5(342)

Google Scholar

[7] Feng Shangyou: Water Resources System Engineering (Hubei Science & technology Press, Wuhan 1991).

Google Scholar