Analyze on Construction Status Long-Span Arch Rib Bridge by Numerical Simulation

Article Preview

Abstract:

Non-cable hoisting frame is a construction method of the main arch ribs of big span bridge. The key issue in the numerical simulation of this type of bridge construction is geometric nonlinearity approach. Construction method of long-span bridge rib and stage-by-stage construction method of a arch bridge was simulated by finite element method. The geometric description was attained comparison with simulation results and the actual measurement of cable force. The results show that finite element method is effectively used in the simulation of long span arch bridge construction.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 480-481)

Pages:

1318-1323

Citation:

Online since:

June 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Y. J Ge: Construction Control of The Bridge Formed by Stages (China Communications Press, Beijing , 2005).

Google Scholar

[2] X.F. Shi, G.Q. Yang, J. Wang et al.: proceedings of the 17th session of the National Bridge Conference Proceedings, Chongqing, China, May 9-11, (2006), pp.996-1002.

Google Scholar

[3] Q. Li, D.S. Shan, Y. Z Po, et al: proceedings of the 17th session of the National Bridge Conference Proceedings, Chongqing, China, (2006), pp.624-628.

Google Scholar

[4] Q. Li, Y.Z. Po, Q.H. Zhang et al.: The Introduction and Application of Geometry Control for The Whole Process of Construction of Large Span Cable-stayed Bridge (Southwest Jiaotong University Press, China 2009).

Google Scholar

[5] Y.C. Peng, G.J. Huang, W.J. Wang, et al.: proceedings of the 6th International Conference on Arch Bridges, Fuzhou, China, October11-13, (2010), pp.157-162.

Google Scholar