Analysis of Parameters' Sensitiveness of Long-Span Hybrid Girder Cable-Stayed Bridge

Article Preview

Abstract:

In order to improve the construction control precision of long-span hybrid girder cable-stayed bridge, the design parameters such as the weight of girder, the cable tensile force and the stiffness of cable are conducted sensitivity analysis through computing and comparing the influences of these parameters on the deflection of girders, the stress of girders and the cable force in the bridge's completion state. It was shown by the computation results that the main parameters of long-span hybrid girder cable-stayed bridge are the weight of girder and the cable tensile force, the stiffness of cable has a little influence on the completion state of the bridge. With this approach, through modifying the main parameters, while ignoring the influences of the secondary ones, the Jingyue Yangtze River Highway Bridge construction control has been successfully done. The test results show that the cable force and the contour of the bridge are in good state. They are both in the range of control, the relative error of the cable force is less than 3% and the elevation deviation is less than 5mm.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

817-823

Citation:

Online since:

June 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen Dewei, Xiang Haifan, Zheng Xinguang. Construction Control Of Concrete Cable-Stayed Bridge[J]. China Civil Engineering Journal. 1993, 26(1): 1-11.

Google Scholar

[2] Liu Xu-zheng, Huang Ping-ming, Xu Han-zheng. Analysis of parameters sensitiveness of cable-stayed bridges with single tower[J]. Journal of Chang an University(Natural Science Edition), 2007, 27(6): 63-66.

Google Scholar

[3] Wang Lifeng, Sun Yongcun, LI Wei. Sensitivity Analysis of Structural Parameters of Suifen River Cable-Stayed Bridge[J]. Word Bridge, 2007, (2): 45-47.

Google Scholar

[4] Yan Donghuang. Determining Of Reasonable Design States And Construction Controlling Of Cable-Stayed Bridge[D]. Chang Sha: Hu Nan University, (2001).

Google Scholar

[5] Li Zhongsan. Study on theory of construction control and control precision for long span cable-stayed bridge[D]. Chang Sha: Chang Sha University Of Science And Technology, (2010).

Google Scholar

[6] Yan Donghuang, Wen Yu, Liu Guangdong, YI Weijian. The Best Constructin Control Of Cable-Stayed Bridge [J]. Journal Of Foreign Highway, 1999, 19(3): 53-58.

Google Scholar

[7] Lei Junqing, Zhao Lei. Influence of key components stiffness of self-anchored suspension bridge on its structure[J]. Journal Of Beijing Jiaotong University(Nature Science edition), 2011, 35(1): 68-72.

Google Scholar