Behavior and Design of Post-Installed Rebar Connections under Temperature

Article Preview

Abstract:

Typical applications for post-installed rebar connections consist in overlapping joints with existing reinforcement or anchoring of the reinforcement at a slab or beam support. At cold state it may be shown by testing that a post-installed rebar system can develop the same bond resistance with the same safety margin as cast-in-place rebar. Consequently, anchorage length and lap length for post-installed rebars can be calculated as for cast-in-place according to the Eurocode 2 provisions. However, when subjected to temperature, the decay in bond properties for post-installed systems is significantly more dramatic than for cast-in-place rebars. The paper presents the result of an experimental campaign carried out on a post-installed connection using a vinylester polymer, investigating the effects on the bond strength both of the temperature and of different testing conditions. Finally, design criteria are provided and applied to a typical case study consisting in a post-installed solid slab.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

783-790

Citation:

Online since:

September 2016

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2016 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] R. Eligehausen and W. Fuchs, Recent developments and open problems in fastening technique, Proc. of 2nd Int. Symp. on Connection between Steel and Concrete, Stuttgart, 2007, pp.43-62.

Google Scholar

[2] EOTA. Technical Report 023, Assessment of post-installed rebar connections. European Organization for Technical Approvals, Brussels, Belgium (2006).

Google Scholar

[3] L. Bouazaoui and A. Li, Analysis of steel/concrete interfacial shear stress by means of pull out test. International Journal of Adhesion and Adhesives, 28 (2008), p.101–108.

DOI: 10.1016/j.ijadhadh.2007.02.006

Google Scholar

[4] H.A. Spieth, J. Oźbolt, R. Eligehausen and J. Appl, Numerical and Experimental Analyis of post-installed rebar spiced with cast-in rebars, Proc. of 2nd Int. Symp. on Connection between Steel and Concrete, Stuttgart, 2007, pp.889-898.

Google Scholar

[5] N. Pinoteau, P. Pimienta, T. Guillet, P. Rivillon and S. Rémond, Effect of heating rate on bond failure of rebars into concrete using polymer adhesives to simulate exposure to fire. International Journal of Adhesion and Adhesives, 31 (2011).

DOI: 10.1016/j.ijadhadh.2011.08.005

Google Scholar

[6] N. Pinoteau, J.V. Heck, Ph. Rivillon, P. Pimienta, T. Guillet, and S. Rémond, Prediction of failure of a cantilever–wall connection using post-installed rebars under thermal loading. Engineering Structures, 56 (2013), p.1607–1619.

DOI: 10.1016/j.engstruct.2013.07.028

Google Scholar

[7] Eurocode 2. EN 1992: Design of concrete structures. European Committee for Standardization, Brussels, Belgium (2004).

Google Scholar

[8] ISO 834-1. Fire-resistance tests — Elements of building construction — Part 1: General requirements. International Organization for Standardization, Geneva, Switzerland (1999).

Google Scholar