Search Options

Sort by:

Sort search results by

Publication Type:

Publication Type filter

Open access:

Publication Date:

Periodicals:

Periodicals filter

Search results

Online since: June 2016
Authors: Wijang Wisnu Raharjo, Eko Surojo, Aditya Utama, Jamasri Jamasri
McLaughlin, Effects of water films and sliding speed on the frictional behavior of truck disc brake materials, Tribology International. 36 (2003) 709-715
Earle (Ed.), Brakes 2000 - Automotive Braking - Technologies for the 21st Century, Professional Engineering Publishing Limited, London, 2000, pp. 51-60
Earle (Ed.), Brakes 2000 - Automotive Braking - Technologies for the 21st Century, Professional Engineering Publishing Limited, London, 2000, pp. 101-109
Online since: August 2014
Authors: Ping Tang, Xiao Shi Zheng, Zheng Wei Wang
RMS for CNC machines will play an important role in maximizing the economic benefits of CNC machines ,helping professionals optimize CNC machines’ design, reducing production costs and improving product competitiveness.
With GPRS network as the data transmission network,we can develop all kinds of promising application in the wireless remote control field, such as meteorological and hydrological monitoring system; data collection systems ;urban water supply systems;car terminals, disaster telemetry and alarm,etc [15] .
Online since: May 2011
Authors: Yong Yao, Xin He, Hong Wen Xia, You Wen Su, Gang Liu
It is important for design professionals and construction managers to realize that while some components may be significant, other components may be insignificant.
Application of PSO-BP Model in Short-Term Prediction of Urban Water Consumption [J].
Online since: January 2014
Authors: An Juan Cai, Chang Sheng Qu, Bing Li, Shui Wang, Hai Suo Wu
However, the values were based largely on professional judgment.
This simulation was conducted by using professional software (@risk 5.7, Palisade Corporation).
Acknowledgements This work was supported by National Natural Science Foundation (Grant No. 41201545), National Meta-Program for Science & Technology of Water Pollution Control (2012ZX07506-001), National 863 Project (2013AA06A309) and Program for Environment Protection in Jiangsu Province (2012070 & 2012072).
Online since: January 2019
Authors: Dorcas A. Ayeni, Olaniyi O. Aluko, Morisade O. Adegbie
In addition, vegetation around buildings also help remove air and water pollutants, improve public health and cool local climate [15].
The commonly used places according to [16] include roofs, walls, terrace garden and sky gardens especially in high-rise as shown in fig 1 to 4, however, more effort is still needed at encouraging the use of vegetation around buildings widely by the built environment professionals.
Online since: July 2014
Authors: Song Wu, Juan Bai
While in the process of construction, due to changes of construction conditions, geology and hydrology and engineering change as well as professional difference of people in charge of the bill quantity bidding, there is always deviation between the actual engineering quantity and the bill quantity bidding.
While in the process of construction, due to changes of construction conditions, geology and hydrology and engineering change as well as professional difference of people in charge of the bill quantity bidding, there is always deviation between the actual engineering quantity and the bill quantity bidding, resulting in contract status change.
Problems and Countermeasures of Water Gap Project Cost Management [J].
Online since: September 2023
Authors: Rahul Singhal, Clevin Toppo, Rupak Biswakarma, Pratap Roy, Sristy Sahu, Ujjal Kalita
Development Advances in Liquid Rocket Engines Turbopump: A Review Rahul Singhal1,a, Clevin Toppo1,b, Pratap Roy1,c, Rupak Biswakarma1,d, Sristy Sahu1,e, Ujjal Kalita2,f 1Bachelor of Technology in Aerospace Engineering, Lovely Professional University, Punjab-144411, India 2Assistant Professor, Mechanical Engineering Department, Lovely Professional University, Punjab-144411, India Email Address: a*rahul.11915413@lpu.in, bclevin.11912184@lpu.in, cpratap.11917235@lpu.in, drupak.11916724@lpu.in, esristy.11904536@lpu.in, fujjal.19355@lpu.co.in Keywords: Liquid Rocket Engine, Turbopump, Rocket Engine Cycles Abstract.
A Water Test Facility For Liquid Rocket Engine Turbopump Cavitation Testing. 7th International Symposium On Cavitation.
Online since: September 2018
Authors: Aleksandr A. Salov, Igor V. Fedoseev, Marina N. Yudenko
In addition, since it is located at the river mouth of the Neva, the city is forced to allow part of the sewage from other regions of the Federation through its main water artery.
A management mechanism that combines the efforts of the authorities, citizens and professionals.
Online since: July 2011
Authors: Geng Xin, Chun Lan Xue, Hai Yan Cao, Zhang Yi, Wu Naili, Shuo Zhang
English performance and professional achievement are no longer rigid conditions in doctoral student admittance, while scientific research ability will be the primary criterion for enrolling doctoral students.
For completing the design and implementation of research projects, the ability of a comprehensive using of a wide range of professional knowledge and experimental skills is necessary.
The stationary phase is the water adsorbed on filter paper; and the mobile phase is the different organic reagents prepared by a certain percentage of the developing solvent. 
Online since: December 2014
Authors: Bo Guo
In 2012, commissioned by the Ying cheng Highway, Engineering Consulting Supervision Center of Hubei and Wuhan University of Engineering and Testing Center joint together to detect the bridge 1.2 Analysis of exterior conditions and risk The surface of the bridge is made of cement concrete structure, which 1/4 have seriously damaged, leading to the water accumulation phenomenon on the surface of the bridge, the main arch ribs basically fall off the bottom of the protective layer with the steel expose and serious corrosion, part steel dome side joints have exposed; ventral arch top of the wave through the cracks, which with a maximum width of 2.5mm, arch transverse abdominal wall walls have cracks (especially around the holes), arch pier surface cracks, and found that observed in the past two years, compared with crack propagation fast; main arch rib cross tie beams largely intact, no diseases, no foundation abutment scour deformation.
whole structure directly, but on the other hand, it increased the old bridge’s constant load, the process of construction is relatively simple, but it give high demand to the stability and bearing capacity of the old bridge’s abutments and piers; Outsourcing steel reinforcement is a craft that is more often used in the reinforcement of double curved arch bridge currently, it was often applied to housing construction in the past , the principle is to increase the stiffness of the arch rib, so that the original steel arch rib and the steel plate can bear forces together, thus improving the carrying capacity of the entire bridge, because this process of construction is relatively simple , the quality of construction is easier to control and the duration is short, it is widely used in bridge reinforcement currently, the disadvantage is, you should pay attention to the steel corrosion treatment, close attention should be paid to corrosive steel in the late period, and it must be done by professional
Figure 3 Before strengthening Figure 4 After wrapping steel Author's brief introduction Bo Guo (1971-),man, AnLu of Hubei, teacher of Urban Construction Institute of Hubei Engineering University, master degree, associate professor, engaged in civil engineering professional teaching and research.
Showing 2251 to 2260 of 3745 items