Calculation of Hongdu Bridge Foundation Construction

Article Preview

Abstract:

Hongdu Bridge is an extraordinarily huge bride across northern branch Ganjiang River, in the city of Nanchang. Main tower adopted single column slanted pylon space twist face back cable structure. Its construction is based on double-wall cofferdam method. The paper discuss thecalculation of key step and key position for the key technology in terms of double-wall cofferdam and platform underwater construction, Which include the design of the base construction and double-wall cofferdam,steel cofferdam construction, the calculation and checking of the cofferdam and so on. The whole length of 9.5 km, except the starting period of about 2.4 km for roadbed type, the other sections of approximately 7 km. The project always invests about 18 Billion yuan.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1264-1267

Citation:

Online since:

September 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ministry of ministerial standard. JTJ041-2000, Technical code for construction of highway bridges and culverts[s]. Beijing: People's Transportation Press, 2000.

Google Scholar

[2] State Standard of the People's Republic of China. GB50021-2001, Ground engineering reconnaissance standards[s].Beijing: China Construction Industry Press,2009.

Google Scholar

[3] State Standard of the People's Republic of China. GB50007-2002, Basic design standards on Construction base[s]. Beijing: China Construction Industry Press,2002.

Google Scholar

[4] Liu Shaolin, Mao Yonglin. Design of Soft Ground Treatment[J]. Technology & Economy in Areas of Communications, 2001.(3):5-6

Google Scholar

[5] Guang Feng, Dai Gonglian. Design and Space Stress of Self-Anchored Suspension Bridge's Maintower[J]. Technology & Economy in Areas of Communications, 2008.10(5):4-6.

Google Scholar