Analysis and Improvement to Coordination Control Circuit of 2×350MW Supercritical Units

Article Preview

Abstract:

The paper introduces the characters of coordinated control system which belongs to 2×350MW supercritical air cooling heating units in a power plant. Meanwhile this article analyzes the control strategyies and the characters of main control circuits of boiler units and steam turbines respectively. The request of supercritical units running steadily and reacting quickly is satisfied by employing the technique of static feed-forward and so on.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

595-599

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhenji Liu: Coordination control and water supply process control [M]. Beijing: China power press (1995).

Google Scholar

[2] Fang Fang: Power unit coordinated control system and advanced control strategy [D]. [Doctoral Dissertation], North China Electric Power University (2005).

Google Scholar

[3] Youping Sha, Liguo Wang, Chunyu Guan: The typical system control strategy of supercritical units [J]. China Power (2006).

Google Scholar

[4] Junfeng Pei: Huaneng Qinbei power plant control system introduced. Power plant construction (2004).

Google Scholar