Study on Models of Planning and Scheduling in IT Manufacturing Processes

Article Preview

Abstract:

Traditionally, Models of IT manufacturing process planning and scheduling were carried out in a sequential way, where scheduling was done after process plans had been delivered. Since the two functions are usually complementary, it is necessary to integrate them correctly so that performance of an IT manufacturing system can be improved efficiently. In the thesis, a new integration model focused on key factors has been developed to facilitate the integration and optimization. The practice of the models show that the proposed approaches are promising and very effective methods for the integration of process planning and scheduling in IT manufacturing processes.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

28-33

Citation:

Online since:

January 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M. Dolores R-Moreno, D. Borrajo, A. Cesta, Integrating planning and scheduling in workflow domains, Expert Systems with Applications 33 (2007) 389-406.

DOI: 10.1016/j.eswa.2006.05.027

Google Scholar

[2] D. Shobrys, D. White, Planning, scheduling and control systems: why cannot they work together, Computers and Chemical Engineering 26 (2002) 149-160.

DOI: 10.1016/s0098-1354(01)00737-2

Google Scholar

[3] C. D., Chorman, T. Dill, F. A Blending OR/MS, Judgement, and GIS: restructuring P&G's supply chain, Interfaces, (1997) 27(1), 101.

DOI: 10.1287/inte.27.1.128

Google Scholar

[4] Larsen NE. Methods for integration of process planning and production planning. International Journal of Computer Integrated Manufacturing 1993; 6(1-2): 152-62.

DOI: 10.1080/09511929308944565

Google Scholar

[5] Li XY, Shao XY, Gao L. Optimization of flexible process planning by genetic programming. International Journal of Advanced Manufacturing Technology 2008; 38: 143-53.

Google Scholar

[6] Moon C, Lee YH, Jeong CS, Yun YS. Integrated process planning and scheduling in a supply chain. Computers and Industrial Engineering 2008; 54: 1048-61.

DOI: 10.1016/j.cie.2007.06.018

Google Scholar

[7] Zhang J, Gao L, Chan FTS. A holonic architecture of the concurrent integrated process planning system. Journal of Materials Processing Technology 2003; 139: 267-72.

DOI: 10.1016/s0924-0136(03)00233-4

Google Scholar

[8] Y. Li, W. Ip, D. Wang, Genetic algorithm approach to earliness and tardiess production scheduling and planning problem, Int. J. Production Economics, 54 (1998) 65-76.

DOI: 10.1016/s0925-5273(97)00124-2

Google Scholar

[9] Kilty, G.L., Inventory management within the supply chain. Hospital Material Management Quarterly2000. 21 (4), 18-24.

Google Scholar

[10] Johannessen, S., Solem, O., Logistics organizations: ideologies, principles and practice. International Journal of Logistics Management 2002. 13 (1), 31-42.

DOI: 10.1108/09574090210806342

Google Scholar

[11] Huang, H.K., Lin, G.C.I., Development of a dual-robot system for prototype production. International Journal of Production Research 2002. 40 (15), 3751-3764.

DOI: 10.1080/00207540210146206

Google Scholar

[12] Jabnoun, N., Sahraoui, S., Enabling A TQM Structure Through Infomation Technology. Competitiveness Review 14 (1/2), 72-81.

DOI: 10.1108/eb046469

Google Scholar

[13] Prasad, B., 2001. What management style in considered best for a team-based organizations and why? International Journal of Value-Based Management 2004. 14, 59-77.

Google Scholar