[1]
M. Dolores R-Moreno, D. Borrajo, A. Cesta, Integrating planning and scheduling in workflow domains, Expert Systems with Applications 33 (2007) 389-406.
DOI: 10.1016/j.eswa.2006.05.027
Google Scholar
[2]
D. Shobrys, D. White, Planning, scheduling and control systems: why cannot they work together, Computers and Chemical Engineering 26 (2002) 149-160.
DOI: 10.1016/s0098-1354(01)00737-2
Google Scholar
[3]
C. D., Chorman, T. Dill, F. A Blending OR/MS, Judgement, and GIS: restructuring P&G's supply chain, Interfaces, (1997) 27(1), 101.
DOI: 10.1287/inte.27.1.128
Google Scholar
[4]
Larsen NE. Methods for integration of process planning and production planning. International Journal of Computer Integrated Manufacturing 1993; 6(1-2): 152-62.
DOI: 10.1080/09511929308944565
Google Scholar
[5]
Li XY, Shao XY, Gao L. Optimization of flexible process planning by genetic programming. International Journal of Advanced Manufacturing Technology 2008; 38: 143-53.
Google Scholar
[6]
Moon C, Lee YH, Jeong CS, Yun YS. Integrated process planning and scheduling in a supply chain. Computers and Industrial Engineering 2008; 54: 1048-61.
DOI: 10.1016/j.cie.2007.06.018
Google Scholar
[7]
Zhang J, Gao L, Chan FTS. A holonic architecture of the concurrent integrated process planning system. Journal of Materials Processing Technology 2003; 139: 267-72.
DOI: 10.1016/s0924-0136(03)00233-4
Google Scholar
[8]
Y. Li, W. Ip, D. Wang, Genetic algorithm approach to earliness and tardiess production scheduling and planning problem, Int. J. Production Economics, 54 (1998) 65-76.
DOI: 10.1016/s0925-5273(97)00124-2
Google Scholar
[9]
Kilty, G.L., Inventory management within the supply chain. Hospital Material Management Quarterly2000. 21 (4), 18-24.
Google Scholar
[10]
Johannessen, S., Solem, O., Logistics organizations: ideologies, principles and practice. International Journal of Logistics Management 2002. 13 (1), 31-42.
DOI: 10.1108/09574090210806342
Google Scholar
[11]
Huang, H.K., Lin, G.C.I., Development of a dual-robot system for prototype production. International Journal of Production Research 2002. 40 (15), 3751-3764.
DOI: 10.1080/00207540210146206
Google Scholar
[12]
Jabnoun, N., Sahraoui, S., Enabling A TQM Structure Through Infomation Technology. Competitiveness Review 14 (1/2), 72-81.
DOI: 10.1108/eb046469
Google Scholar
[13]
Prasad, B., 2001. What management style in considered best for a team-based organizations and why? International Journal of Value-Based Management 2004. 14, 59-77.
Google Scholar