Restructuring and Analysis of the Overhead Crane's Span

Article Preview

Abstract:

Due to the change of application site, the box beam overhead crane's span needs restructuring. An overhead crane span’s increase restructuring was analyzed by mechanics analysis method. The detailed calculation and feasibility analysis was done. It provides a basic theory for the equipment's restructuring design and analysis work.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

549-553

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] H.J.Li, Y.F. Tao: Relationship Between Strength and Stiffness in the Design of Main Girder of Overhead and Gantry Crane. Journal of Taiyuan University of Science and Technology. Vol.32(2011), pp.29-32.

Google Scholar

[2] H.M.Li: An Analysis on the Design of MQ10-18 Crane. Journal of Waterborne Transportation Institute, 2004,4,pp.6-10.

Google Scholar

[3] S.M. Liu, P.Lan, N.L. Lui: Effect of frictional force at halved joint between booms to total stability of box type telescope boom in lifting plane. Construction Machinery, 2009,13,pp.57-61.

Google Scholar

[4] Dalian Crane Factory: Crane Design Manual. Shenyang: Liaoning People's Press, 1982.

Google Scholar

[5] J.N. Wang: Metal structure of lifting transport. Beijing: China Railway Publishing House, 2002.

Google Scholar

[6] C.K. Yang: Lifting equipment. Beijing: Mechanical Industry Press, (1986)

Google Scholar

[7] M.L. Yang, Xu G.N.Xu, Z.Y. Chang. Finite Element Modal Analysis of Overhead Traveling Crane's Structure, Vol.31(2012),pp.135-137.

Google Scholar