Through the Analysis of the First Stage Project of Shenyang Subway Line One, Summarizing Effective Measures of Reducing Cost of Subway

Article Preview

Abstract:

From analyzing project cost of the first-stage project of Shenyang subway line one,there are several important factors affecting the cost of Shenyang subway line one. By the analyzing cost of land pulling down,design fees,power supply system,vehicle,shield machine and laying mode and comparing with cost of other urban subway. Finally we summed up the effective measures to reduce the cost of subway .

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1824-1828

Citation:

Online since:

December 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yangyizhao: some thinking about reduceing the cost of city metro construction [J]. journal of economic construction2004(7): 37-40 In Chinese.

Google Scholar

[2] Song jian, JiaPeng: the general thought about reducing Shenyang subway cost. Modern tunnel technology, 2006. 4, 43 (2) In Chinese.

Google Scholar

[3] GaoJing, Wangyuanfeng: Analysis that prophase work of metro impact on the cost of metro construction Railway engineering cost management, 2007. 7 In Chinese.

Google Scholar

[4] LiuXiao: Discuss the subway shield method construction cost. Railway survey and design In Chinese.

Google Scholar

[5] Chen wei.: Reasonable choice of power supply mode to save metro power system investment In Chinese.

Google Scholar

[6] P.G. Clem, M. Rodriguez, J.A. Voigt and C.S. Ashley, U.S. Patent 6, 231, 666. (2001).

Google Scholar