Solving Fuzzy U-Shaped Line Balancing Problem with Exact Method

Article Preview

Abstract:

The basic U-shaped line balancing problem (ULBP) model usually needs to be extended in order to solve real-world line balancing problems. Most of the models for line balancing problem reported in the literature assume constant and deterministic operation times. In this paper, the U-shaped line balancing problem with fuzzy operation times is studied. First, the integer programming formulation of fuzzy ULBP is constructed. The tasks operation times are formulated by triangular fuzzy membership functions. Then the fuzzy ULBP is solved by using the software of Lingo 9.0 extended version. An illustrative example is followed to demonstrate the validity of the proposed models.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1046-1051

Citation:

Online since:

June 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] A. Scholl and C. Becker, State-of-the-art exact and heuristic solution procedures for simple assembly line balancing, European Journal of Operational Research, vol. 168, pp.666-693, 02 (2006).

DOI: 10.1016/j.ejor.2004.07.022

Google Scholar

[2] G. R. Aase, et al., U-shaped assembly line layouts and their impact on labor productivity: An experimental study, European Journal of Operational Research, vol. 156, pp.698-711, (2004).

DOI: 10.1016/s0377-2217(03)00148-6

Google Scholar

[3] G. J. Miltenburg and J. Wijngaard, The U-line line balancing problem, Management Science, vol. 40, pp.1378-1388, 10 (1994).

DOI: 10.1287/mnsc.40.10.1378

Google Scholar

[4] R. K. Hwang, et al., U-shaped assembly line balancing problem with genetic algorithm, International Journal of Production Research, vol. 46, pp.4637-4649, (2008).

DOI: 10.1080/00207540701247906

Google Scholar

[5] G. R. Aase, et al., U-OPT: an analysis of exact U-shaped line balancing procedures, International Journal of Production Research, vol. 41, pp.4185-4210, Nov (2003).

DOI: 10.1080/0020754031000149176

Google Scholar

[6] T. L. Urban, Note. Optimal balancing of U-shaped assembly lines, Management Science, vol. 44, pp.738-741, May (1998).

DOI: 10.1287/mnsc.44.5.738

Google Scholar

[7] H. Nguyen Van, A heuristic solution for fuzzy mixed-model line balancing problem, European Journal of Operational Research, vol. 168, pp.798-810, 02 (2006).

DOI: 10.1016/j.ejor.2004.07.029

Google Scholar

[8] D. J. Fonseca, et al., A Fuzzy Logic Approach to Assembly Line Balancing, Mathware & Soft Computing, vol. 12, pp.57-74, (2005).

Google Scholar

[9] Z. Zhang, et al., A heuristic approach for fuzzy U-shaped line balancing problem, in 6th International Conference on Fuzzy Systems and Knowledge Discovery, Tianjin, 2009, pp.228-232.

DOI: 10.1109/fskd.2009.731

Google Scholar

[10] Y. Tsujimura, et al., Solving fuzzy assembly-line balancing problem with genetic algorithms, Computers & Industrial Engineering, vol. 29, pp.543-547, Sep (1995).

DOI: 10.1016/0360-8352(95)00131-j

Google Scholar

[11] T. P. Hong and T. N. Chuang, A new triangular fuzzy Johnson algorithm, Computers & Industrial Engineering, vol. 36, pp.179-200, (1999).

DOI: 10.1016/s0360-8352(99)00008-x

Google Scholar