Abstract:

Safety is essential for tower cranes in construction engineering, as the inner-climbing tower crane is widely used in the construction of high-rise structures, design safety, reliability and support system which can be turnover is an important prerequisite for protecting the safety of construction. By understanding the interrelationships between construction environment of Henglong Plaza Twin Towers in Shenyang city and ZSL2700 tower, the article will analyse the support system for the project. It mainly uses finite element analysis software ANSYS which can create mechanical status of modeling to analyzing the supporting structure. It can guarantee the structures rationality and the security reliability. Project Summary Shenyang municipal government square tower engineering which building height is 350.6m has the underground layer 4 and the ground 70 layer. The office building has used the frame core tube structure system. The outside frame is composed by the square shape section coagulation earth pyramid and the peripheral steel girder. The rectangular core tube was the reinforced concrete, while in the core tube outer wall has established some steel pole. This project adopt two boom tower cranes from Zhongsheng construct machine company (Nanjing).The first number tower crane is ZSL750, which maximum torque is 750tm; the second number tower cranes is ZSL2700. This paper takes the ZSL2700 tower crane as an object, studying this machines stressful condition of attachment system. The ZSL2700 tower cranes most high-torque is 2600tm, pitching arm angle ranges 85-65 .The maximum lifting load is 100t. The biggest hoisting up scope is 55m, which lifting load is 37.6t.When the crane surpasses the permission lifting load or the hoisting up moment of force, PLC can break the power implementation protection automatically. The tower machine need carry on 19 climbs in the construction process. Fig. 1 Two tower crane installation location diagram

You might also be interested in these eBooks

Info:

Periodical:

Pages:

338-342

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Liu Gang, He Ming, Application of luffing jib tower crane for constructing high-rise building , Construction Mechanization,(2008), 02(TH213.3).

Google Scholar

[2] Tower crane Design Standard, GB/13752-92, Vol. 8 (1993).

Google Scholar

[3] ANSYS APDL Programmer's Guide Release10.0.Ansys,Inc.

Google Scholar

[4] Xijian Zheng,Zhengyi Xie: The application of finite of elements to analysis about tower cranes ,in Journal of Construction Machinery(2007),Feb.2,pp.33-35.

Google Scholar

[5] Qian jiaru, Xu Fujiang, Deformation Decomposition Rule of RC Frame Croe Tube Structures, Building Structure, (2006).

Google Scholar

[6] Zhan Weigang, Wang Jia, Lu, Nianli, Research on support spacing of tower crane, Advanced Materials Research, Vol. 255-260, pp.499-503, (2011).

DOI: 10.4028/www.scientific.net/amr.255-260.499

Google Scholar

[7] Gao Chong-ren, Ren Hui-li, ZhangHong-li, Calculation of finite element about attachment device of tower crane, Construction Mechanization, Vol. 4(2006).

Google Scholar