The Study of Construction Settlement Observation

Article Preview

Abstract:

Building settlement observation is often measured with leveling. And the elevation difference between the settlement observation points and benchmarks is periodically observed in the building. This paper discusses the problems of how to set the settlement observation points, how to implement the settlement observation and how to arrange the cycle of the settlement observation, this paper gives valuable methods and suggestions in the end.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1640-1643

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang DeCheng, Completely Plan of Processing Building Subsidence Data and Drawings, Urban Geotechnical Investigation & Surveying, vol. 5, p.142–144. Oct. (2010).

Google Scholar

[2] Tian HaiYong, The Interrelated Problems of Settlem ent Observation for Highrise Building, Urban Geotechnical Investigation & Surveying, vol. 5, p.147–151. Oct. (2010).

Google Scholar

[3] National standards of one and second-class leveling measurement (GB/T12897-2006). national bureau of technical supervision. China standards press. (2006).

Google Scholar

[4] Cheng WeiQing, High-rise Building Subsidence Observation Data Processing and Analysis, Urban Geotechnical Investigation & Surveying, vol. 3, p.130–132. Jun (2010).

Google Scholar