Study on the Quality Control of the Concealed Works of Construction Project

Article Preview

Abstract:

This thesis analyses on current situation of the concealed work on the basis of the practical research, concludes the mainly attention aspects and more practical solving methods of Chinese concealed works in the three stages. Finally the development directions of the concealed work are proposed.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1511-1514

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen Dongguang, How to Organize Concealed Work, Project Management (in Chinese) 2004. 06.

Google Scholar

[2] Zhou Fangyou, The Concealed Engineering Analysis and Quality Management of Infrastructure Projects, Shanxi Architecture (in Chinese), 2007. 33.

Google Scholar

[3] Lu Yongzhao, Analysis of the Main Factors in the Management of Construction Work, China Construction (in Chinese), 2010, 06.

Google Scholar