The Design and Application of Information Data Base of Construction Cost

Article Preview

Abstract:

Under the current construction cost management system, bill of quantity is only applicable to project transaction period and project implementation period, while the earlier stage of project which is decisive for construction cost control still adopts estimation and budget estimate under quota mode. However, hysteresis quality of quota cannot timely reflect the current situations of market, causing the interface failure between the two modes, and even the failure of investment control. The paper, in light of foreign advanced experience and Chinas national condition characteristics, puts forward the design philosophy of information data base of construction cost which is more suitable for valuation with bill quantity, which provides completed construction cost data as basis for the construction cost overall-process management based on bill of quantity.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2153-2158

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Takashi Ishikawa: Expert Systems with Application, 1996, 10(4): 351-356.

Google Scholar

[2] Min Hwang and Quigley: Journal of Regional Science, 2006, 8(46): 425-453.

Google Scholar

[3] LIU Leyi: Fuxin: Liaoning Technology University, 2011,. In Chinese.

Google Scholar

[4] Stephen Mak: Automation in Construction, 2001(10): 257-263.

Google Scholar

[5] Martin Skitmore, Steve Stradling, Alan Tuohy, ect. The Accuracy of Construction Price Forecasts : A Study of Quantity Surveyors' Performance in Early Stage Estimating [M]. Salford: Martin Skitmore, (1990).

Google Scholar

[6] K. Karstila,B. C: Construction Information Digital Library, (1991).

Google Scholar