Road Inspection Scheduling Model Using Constraint Programming

Article Preview

Abstract:

The research objective is to support the maintenance unit with route planning prior to performing road inspection, the model is based on VRP problem settings, and with the addition of compulsory road sections and allowing shortcuts through small pathways during the inspection to reduce time consumption. By employing Constraint Programming (CP) technology and optimization solution mechanism to construct inspection scheduling model, and the objective is to minimize time consumption of the road inspection. The province and county roads in Douliou city are chosen as examples for analysis, plans out best routes for inspection process, and also displays all the road sections passed by inspection vehicle. Thus this model can be used as reference to support the authorities to efficiently allocate resources for the inspection process, and achieve the objective as shorten the inspection time consumption.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2720-2725

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] T. Fruhwirth, S. Abdennadher, Essentials of Constraint Programming, Berlin, Springer (2003).

Google Scholar

[2] P. Baptiste, C.L. Pape, and W. Nuijten, Constraint-Based Scheduling-Applying Constraint Programming to Scheduling Problem, Kluwer, Boston (2001).

DOI: 10.1016/s1574-6526(06)80026-x

Google Scholar

[3] S, Heipcke, Combined Modeling and Problem Solving in Mathematical Programming and Constraint Programming, Ph.D. Thesis, University of Buckingham, UK (1999).

Google Scholar

[4] S.C. Brailsford, C.N. Potts, and B.M. Smith, Constraint satisfaction problems: Algorithms and applications, European Journal of Operational Research, vol. 119, pp.557-581 (1999).

DOI: 10.1016/s0377-2217(98)00364-6

Google Scholar

[5] S.S. Liu, C.J. Wang, Optimization Model for Resource Assignment Problems of Linear Construction Projects, Automation in Construction, Vol. 16, Issue 1, pp.460-473 (2007).

DOI: 10.1016/j.autcon.2006.08.004

Google Scholar

[6] S.S. Liu, C.J. Wang, Resource-Constrained Construction Project Scheduling Model for Profit Maximization Considering Cash Flow, Automation in Construction, Vol. 17, Issue 1, pp.966-974 (2008).

DOI: 10.1016/j.autcon.2008.04.006

Google Scholar

[7] S.S. Liu and C.J. Wang, Two-Stage Profit Optimization Model for Linear Scheduling Problems Considering Cash Flow, Construction Management and Economics, Vol. 27, Issue 11, pp.1023-1037(2009).

DOI: 10.1080/01446190903233111

Google Scholar