Research on the Calculation Method of Engineering Insurance Rate Based on Bill of Quantitles

Article Preview

Abstract:

This paper introduces a calculation method of engineering insurance rate based on engineering cost. The research has great significance for promoting the development of the engineering insurance and improving the exits project risk management model. The paper uses the modification method and the maximum possible loss method to calculate the engineering insurance rate. Firstly, the paper calculates the insurance rate of part project according to engineering costs and risks of each separated project, then gets the insurance rate of unit project through the weighted average of the proportion of part project costs. Similarly, it is available to get the insurance rate of other single project. Ultimately, the overall engineering insurance rate for the engineering project can be obtained.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2818-2825

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang He. Engineering Insurance. 1st edn, China Financial Publishing House(2005), Beijing. In Chinese.

Google Scholar

[2] Bian Yijie, Chen Jianjun, Li Liangchen, Wang Wanghai. Construction Economy, 2007(12), pp.106-109. In Chinese.

Google Scholar

[3] Jia Sasa, Liao Jiang. (Shanxi Architecture, 2008( 33), 270-271. In Chinese.

Google Scholar

[4] Zhang Yinglon, Hu Hao, Huang Li. Construction Economy, 2008(3), pp.74-77. In Chinese.

Google Scholar

[5] Hu Hao, Zhang Yinglon. Science & Technology Progress and Policy, 2008(10), 71-73. v. n Chinese.

Google Scholar

[6] Wang Fating. China, Zhejiang University. 2003, In Chinese.

Google Scholar

[7] Li Sai, Tian Jin, TianJin University, 2003. In Chinese.

Google Scholar

[8] Wang Xueqing, Meng Haitao, Yu Gang. China Civil Engeering Journal, 2009(1), pp.130-134. In Chinese.

Google Scholar

[9] David Hillson. Newtown Square: PMI,2002, pp.86-98.

Google Scholar

[10] David Hillson. Journal of Facilities Management,2003(1), pp.85-97.

Google Scholar

[11] David Hillson,Sabrina Grimaldi,Carlo Rafele. Risk Management,2006(8), pp.61-76.

Google Scholar