Coupling Real-Time Control of Construction Safety and Progress of Roller Compacted Concrete Dam during the Construction Period

Article Preview

Abstract:

During the construction period of roller compacted concrete (RCC) dam, the scientific control of safety and progress is very important. It can provide guarantee for realizing the high-standard, high-intensity, continuous and rapid construction. First, through analyzing the coupling relationship between construction safety and progress, the procedure of progress control coupling safety analysis was proposed. Second, a mathematical model for coupling control of construction safety and progress that considers complex constraints was developed. Third, a construction simulation system considering safety factors was developed. Finally, these methods were applied to a practical project, and can provide new theoretical principles and technical support for safety and progress control in the RCC dam construction process.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1454-1458

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhou Cheng, Ding Lieyun, et al: Construction Technology. Vol. 39 (2010), pp.17-20, 24.

Google Scholar

[2] Zhang Duanliang, Wang Jian, et al: Highway Engineering. Vol. 36 (2011), pp.124-128.

Google Scholar

[3] Koehn E, Datta N: J Constr Eng Manage. Vol. 129 (2003), pp.562-569.

Google Scholar

[4] Zhong Denghua, Chang Haotian, et al: Int J Hydropower Dams. Vol. 19 (2012), pp.70-74.

Google Scholar

[5] Chang Haotian, Zhong Denghua, et al: Journal of Tianjin University. Vol. 46 (2013), pp.29-37.

Google Scholar

[6] Li Jingru, Zhong Denghua, et al: Journal of System Simulation. Vol. 18 (2006), pp.116-119, 124.

Google Scholar

[7] Abourizk S., Halpin D., et al: J Constr Eng Manage. Vol. 137 (2011), pp.843-852.

Google Scholar