p.1464
p.1468
p.1472
p.1477
p.1481
p.1487
p.1497
p.1503
p.1507
The Special Construction Scheme Exploration of the South-to-North Water Transfer Project Approach Bridge in the Upper Box Girder Bridge
Abstract:
In this paper, combined with the approach bridge of cast-in-place continuous box girder project,discussion on the main bridge construction with support cast-in-place scheme design.The role of a great reference for large-scale projects,from the implementation of the index statistics, analysis shows that, to achieve even better than the specification requirements, and achieved the desired results.
Info:
Periodical:
Pages:
1481-1486
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: