Risk Assessment and Preliminary Study of Safety Management System on Construction Works

Article Preview

Abstract:

In recent years, the construction industry has flourished in China. Through investigating construction safety accident data of one city and combing with engineering construction site, construction works risk control system was built. We used fuzzy analytic hierarchy process to access the risk of the factors and made a conclusion that the safety management and construction conditions should be primarily controlled in construction works. Finally, a preliminary study was done about Construction Project Safety Management System.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1917-1921

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] SU Yan-lei: Falls from a height into the construction safety the number one killer ,. China Construction News 5. 2 (2013).

Google Scholar

[2] ZHAO Zhi-jing, ZHAO Fan: High-rise building construction (second edition)( China Building Industry Press, Beijing 2005).

Google Scholar

[3] L. Feng: Study on Formation Causation of Building Safety Accident and Early Warning Management. Doctoral dissertation, Tianjing University of Finance and Economics, China (2008).

Google Scholar

[4] LAN Ji-bing, et at: Research on the Priorities of Fuzzy Analytical Hierarchy Process. Systems Engineering-Theory & Practice Issue 9 (2006).

Google Scholar

[5] Charles F. Van Loan, K. -Y. Daisy Fan: Matlab Programming for Computing Science and Engineering (Trans Tsinghua University Press, Beijing 2012).

Google Scholar

[6] D. Wang: Timu. Postgraduate thesis, North China Electric Power University, China (2012).

Google Scholar

[7] GE Li, LI Hui-qiang, TU Ping-hui: Thinking on Building the Modern Safety Management System of Construction. Construction Economy Issue 12 (2007).

Google Scholar

[8] LI Yan, LI Jin-hua: Comparative Study of domestic and foreign construction safety production management mode. Construction Safety Issue 2 (2006).

Google Scholar

[9] D.K.H. Chua Y.M. Goh: Application of case based reasoning in construction safety planning. International Workshop on Information Technology in Civil Engineering Nov 2-3 (2002).

Google Scholar

[10] C.M. Tam, Thomas K.L. Tong, et al: Non-structural fuzzy decision support system for evaluation of construction safety management system. Project Management Vol. 20 (2002), pp.303-313.

DOI: 10.1016/s0263-7863(00)00055-7

Google Scholar