Structure Design Draft Tube of Xiaoshankou Hydropower Station

Article Preview

Abstract:

This The draft tube is one of the main load-bearing structure of the hydropower plant, The hydropower draft tube of Xiaoshankou is an underground space structure, mainly composed by the taper pipe segment, elbows segment and diffusion segment. This paper describe the structure design and calculation process of Xiaoshankou hydropower draft tube, including the draft tube load calculation, structural mechanics just Rigid panels calculate internal force calculation and reinforcement calculation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

4159-4162

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hydraulic reinforced concrete structure design specifications, (SL191-2008) [S Beijing: China Water Power Press, (2008).

Google Scholar

[2] The Hydropower Plant design specifications, (SL266-2001) [S] Beijing: China Water Power Press, (2001).

Google Scholar

[3] Liu Chi-zhao, Hydropower Station [M] . version 3. Beijing: China Water Power Press, 2007 (3) : 325-332.

Google Scholar

[4] Yu Shengpo, Xu Zhihuan, Chen Lei. Jiangkou hydropower tail pipe structure design [J], Northeast Water Resources and Hydropower, 2007 (1) : 35-38.

Google Scholar

[5] Kang Jianrong. Form Design and Construction in Transition Section of Draft Tube at Qingju Hydropower Station. [J]. SICHUAN Water Power. 2005. 24(5). 63-66.

Google Scholar