[1]
Quanke Pan, Jianying Zhu. Job shop's dynamic scheduling research [J]. The paper of Nanjing University of Aeronautics and Astronautics. 2005, 37(2): 262-268.
Google Scholar
[2]
Abumaizar R J, Svestka J A. Disruptions [J]. Int . J . Prod. Res, 1997, 35: 2065-(2082).
Google Scholar
[3]
Xin Yu Li. Solving methods research for the problem of process planning and shop scheduling [D]. Wuhan: Huazhong University of Science and Technology doctoral thesis, (2009).
Google Scholar
[4]
Zhang Chao Yong, Li Xin Yu, Wang Xiao Juan and so on. Dynamic scrolling window-based multi-objective optimization scheduling [J]. The Chinese Mechanical Engineering, 2009, 20 (18): 2190-2197.
Google Scholar
[5]
Nelson R T, Holloway C A Implementation Heuristics for a Wong R M. Centralized Scheduling and Priority Dynamic Job Shop Model with due Dates and Variable Processing Time [J]. AIIE Transactions, 1977, 19(2): 96-102.
DOI: 10.1080/05695557708975127
Google Scholar
[6]
Deng Jing. The intelligent Scheduling of flexible manufacturing system [J]. Advanced manufacturing and materials technology, 2000, 2 (3): 20-25.
Google Scholar
[7]
Fang J, Xi Y G. A rolling horizon job shop rescheduling strategy in the dynamic environment [J]. The International Journal of Advanced Manufacturing Technology, 1997, 13(3): 227-232.
DOI: 10.1007/bf01305874
Google Scholar
[8]
Sabuncuoglu I, Karabuk S. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines [J]. Journal of Manufacturing Systems, 1999, 18(4): 268-281.
DOI: 10.1016/s0278-6125(00)86630-3
Google Scholar
[9]
Zhang Guo Hui. scheduling research on flexible job shop [D]. Wuhan: Huazhong University of Science and Technology doctoral thesis, (2009).
Google Scholar
[10]
Wang Chao. The research for job Shop Scheduling Problem based on Petri Nets. Beijing: Bei jing jiao tong university master thesis, (2011).
Google Scholar