Modeling and Case Study of the Production Line Layout System

Article Preview

Abstract:

A study on production line layout problem indicates there is a lack of research on the production line design issue. Traditional methodology on this problem mainly depends on the designers experience and calls for theory analysis and quantitative study. To control the cost and optimize the resource utilization of enterprises, this paper develops a multi-stage integer programming model to describe the production line layout problem, and proposes a heuristic algorithm to solve the problem. A practical example illustrates the effectiveness of the model.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1373-1380

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] S. Benjaafar, S.S. Heragu, and S.A. Irani. Next generation factory layouts: research challenges and recent progress. Interfaces, 32(6): 58–76, (2002).

DOI: 10.1287/inte.32.6.58.6473

Google Scholar

[2] G.C. Hadjinicola. Manufacturing costs in serial production systems with rework. Journal of the Operational Research Society, 61(2): 342–351, (2009).

DOI: 10.1057/jors.2008.186

Google Scholar

[3] M. Haouari and L. Hidri. On the hybrid flow shop scheduling problem. International Journal of Production Economics, 113(1): 495–497, (2008).

DOI: 10.1016/j.ijpe.2007.10.007

Google Scholar

[4] L. Hidri and M. Haouari. Bounding strategies for the hybrid flow shop scheduling problem. Applied Mathematics and Computation, 217(21): 8248–8263, (2011).

DOI: 10.1016/j.amc.2011.02.108

Google Scholar

[5] S.M. Johnson. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1(1): 61–68, (1954).

DOI: 10.1002/nav.3800010110

Google Scholar

[6] M. Kuroda and T. Tomita. Robust design of a cellular-line production system with unreliable facilities. Computers & Industrial Engineering, 48(3): 537–551, (2005).

DOI: 10.1016/j.cie.2004.03.004

Google Scholar

[7] J. Li and S.M. Meerkov. Production systems engineering. (2008).

Google Scholar

[8] E.J. Muth. Stochastic processes and their network representations associated with a production line queuing model. European Journal of Operational Research, 15(1): 63–83, (1984).

DOI: 10.1016/0377-2217(84)90049-3

Google Scholar

[9] C.T. Papadopoulos, M.E.J. O'Kelly, M.J. Vidalis, and D. Spinellis. Analysis and design of discrete part production lines. Springer, (2009).

DOI: 10.1007/978-0-387-89494-2_2

Google Scholar

[10] D. Quadt and H. Kuhn. A taxonomy of flexible flow line scheduling procedures. European Journal of Operational Research, 178(3): 686–698, (2007).

DOI: 10.1016/j.ejor.2006.01.042

Google Scholar

[11] H. Basali, B. Hussin, S.A. Asmai, N.K. Ibrahim, and A.S. Shibghatullah. The integration of simple Markov model in solving single line. Information Technology in Asia, (2011).

DOI: 10.1109/cita.2011.5998611

Google Scholar

[12] I. Ribas, R. Leisten, and J.M. Framinan. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective. Computers &Operations Research, 37(8): 1439–1454, (2010).

DOI: 10.1016/j.cor.2009.11.001

Google Scholar

[13] D. Spinellis, C. Papadopoulos, and J.M. Smith. Large production line optimization using simulated annealing. International Journal of Production Research, 38(3): 509–541, (2000).

DOI: 10.1080/002075400189284

Google Scholar

[14] D.D. Spinellis and C.T. Papadopoulos. A simulated annealing approach for buffer allocation inreliable production lines. Annals of Operations Research, 93(1): 373–384, (2000).

Google Scholar

[15] T. Urlings, R. Ruiz, and T. Stutzle. Shifting representation search for hybrid flexible flow line problems. European Journal of Operational Research, 207(2): 1086–1095, (2010).

DOI: 10.1016/j.ejor.2010.05.041

Google Scholar