Explore the Management of Hydro-Engineering Project and Related Issues about Quality Control

Article Preview

Abstract:

Since reform and opening, water conservancy and hydropower construction industry become more competitive. Water conservancy and hydropower project construction involve a wide range, which is an extremely complex and comprehensive process. It coupled with the production flow of water conservancy and hydropower projects, structure type, quality requirements, construction methods, construction period, and the natural conditions in different situations, which all directly affect the construction quality of the project. This article outlines the construction of water conservancy and hydropower project management features, and discussed ways and means of quality control.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2083-2086

Citation:

Online since:

September 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Pei Tiejun, Bai Xufei. Water Technology has made new progress in our correlation analysis [J]. Heilongjiang Science and Technology Information 2009 (01).

Google Scholar

[2] Guo Xiaofeng, Gongai Feng, Yang Shufeng On the water conservancy project management system. Engineering and Technology.

Google Scholar

[3] Jiang Taihui; under the new situation of rural water conservancy project management of new ideas [J]; intellect; 2011 02.

Google Scholar

[4] Shi Yanmei; Lu Qin-Hua; Lee with war; Reflections on Strengthening Water Management [J]; Modern Agriculture; 2010 04.

Google Scholar

[5] Zhang Tao are; actively promote water conservancy project management modernization [J]; Chinese high-tech enterprises; 2010 36.

Google Scholar