Analysis of Fuse Installed Interference Problem

Article Preview

Abstract:

fuse trip interlock line fixed plate and front plate reinforcing ribs interference problems often occur in assembly, analyzed the data by field measurement,, establish project objectives, quantitative targets, through causal analysis, cause analysis, find the reason, the main reason to find the improvement scheme, and finally establish control plan, monitor the production situation, in order to control the situation in production. According to the investigation on the interference problem of fuse trip interlock line in installation, detailed analysis of the process, the question gives effective solutions, and dynamic quality assurance measures, provided the reference method for solving this kind of problems.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

905-908

Citation:

Online since:

September 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yangquan Li, Jian Wu. Gasification furnace heat pipe failure analysis and repair [J]. Equipment management and maintenance, 2011, (S1): 75-77.

Google Scholar

[2] car engine and tire remanufacturing process quality control and evaluation of technical research remanufacturing research group. Automobile engine and tire remanufacturing process quality control and evaluation of technical research [J]. Authentication technology, 2011, (01): 47-49.

Google Scholar

[3] Shaokuan Liu, shijiang Shu. Tan pressure vessel manufacturing quality control [J]. China Petroleum and Chemical Standard and Quality, 2011, (06): 233.

Google Scholar

[4] Ying Shao. Pressure vessel manufacturing enterprise quality system prone to problems and analysis [J]. Metal processing (thermal processing), 2011, (12) : 54-56.

Google Scholar