Quality and Maturity of BIM Implementation in the AECO Industry

Article Preview

Abstract:

The overall adoption of Building Information Modeling (BIM) has increased considerably in recent years; however, utilization of BIMs post-construction is still seldom explored or documented. Much of this may be due to the fact that there still remains great inconsistency between stakeholders levels of BIM proficiency. In order to achieve a life-cycle use of BIMs, it is critical that the Architecture, Engineering, Construction, and Operations (AECO) industry determine if it is moving closer to achieving a mature BIM standard or if organizationally it is still just grazing the surface of what BIM can do. Based on a survey of a diverse sample of the construction industry, this study evaluates the quality and maturity of BIM implementation across various organizations as well as the quality of BIM execution on current construction projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1621-1627

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] McGraw-Hill Consruction, The business value of BIM: getting building information modeling to the bottom line, McGraw-Hill Construction SmartMarket Report, McGraw Hill: New York, (2009).

DOI: 10.1126/science.152.3724.903.a

Google Scholar

[2] N. Gu, K. London, Understanding and facilitating BIM adoption in the AEC industry, Journal of Automation in Construction, 19 (2010) 988-999.

DOI: 10.1016/j.autcon.2010.09.002

Google Scholar

[3] B. Gilligan, J. Kunz, VDC use in 2007: significant value, dramatic growth, and apparent business opportunity, CIFE Technical Reports: 2007, <http: /www. stanford. edu/ group/CIFE /online. publications/TR171. pdf> (Dec 4, 2010).

Google Scholar

[4] A. T. Hheron, A. Marshall-Ponting, G. Aouad, Building information modeling: literature review on model to determine the level of uptake by organization, Proceedings from the W078- Special Track 18th CIB World Building Congress, May 2010, Salford, United Kingdom.

Google Scholar

[5] Y. Saleh, M. Alshawi, An alternative model for measuring the success of IS projects: the GPIS mode l, Journal of Enterprise Information Management, Vol. 18 1 (2005) 47-63.

DOI: 10.1108/17410390510571484

Google Scholar

[6] NIST, National Building Information Modeling Standard - Version 1. 0 - Part 1: Overview, principles and methodologies, National Institute of Building Sciences, (2007).

Google Scholar

[7] P. C. Suermann, R. R. A. Issa, T. L. Mccuen, Validation of the U.S. National building information modeling standard interactive capability maturity model, 12th International Conference on Computing In Civil and Building Engineering, October 16-18, 2008, Beijing, China.

Google Scholar

[8] B. Succar, Building information modeling maturity matrix. Chapter in Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies, (2009).

DOI: 10.4018/978-1-60566-928-1.ch004

Google Scholar

[9] CIFE, CIFE VDC Scorecard and BIM Scorecard, 2009 http: /vdcscorecard. stanford. edu/ cifevdc. weebly. com/index-2. html.

Google Scholar

[10] VICO, Calculating your BIM Score, 2011, http: /www. vicosoftware. com/resources/ calculating-bim-score/tabid/273811/Default. aspx.

Google Scholar

[11] Computer Integrated Construction (CIC) Research Group, BIM Project Execution Planning Guide, Pennsylvania State University, (2010).

Google Scholar