p.1848
p.1853
p.1862
p.1867
p.1872
p.1878
p.1883
p.1889
p.1893
Risk Study on Subway Construction Based on Reliability Theory
Abstract:
This paper described the present risks existing in subway construction and proposed the idea that reliability theory can be applied in the field of subway construction. Based on this, a parallel-series model of risk control system was established. According to the required target of system reliability, combining with the reliability distribution theory, the reliabilities of each subsystem that constituted the parallel-series model can be determined. Aiming at the basic events that constituted the subsystem, average allocation method was taken to solve the basic events reliabilities and an example was given. This studies showed that reliability theory can be successfully applied in the field of subway construction and can fulfill the optimization of construction safety under a given security target.
Info:
Periodical:
Pages:
1872-1877
Citation:
Online since:
December 2010
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: