Arc Welding Working Hours Based on MODAPTS

Article Preview

Abstract:

MODAPTS of Industrial Engineering (IE) work measurement was used for formulating welding hours. It was analyzed the program, operations and motion of production process on the arc welding production site. According to the theory of similar manufacturing principle, the auxiliary operation of the arc welding was divided into standard operation, typical operation and special operation. Their working hours were respectively analyzed and estimated. Arc welding operation time was treated as a set of the basic time and auxiliary operation sequence time. It is more scientific, rationalization and standardization for the welding hours, and improves the efficiency of formulating welding hours. A using example was given.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

185-190

Citation:

Online since:

November 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Tonga F M. Summary of a Heuristic line balancing Procedure [J]. Management Science, 1960, 7(1): 21-24.

Google Scholar

[2] Yi Shuping, Guo Fu: Basic industrial engineering, China Machine Press, (2007).

Google Scholar

[3] Wang Xiulun: Modern process management techniques, China Railway Publishing House, (2004).

Google Scholar

[4] Song Chunli: IE practice question and answer, Inner-Mongol People Publishing House, (1992).

Google Scholar

[5] Kong Xianwei, Ma Ziqin, and Cheng Qiang: Machinery manufacturing man-hour quota method research based on industrial engineering MOD [J], Shanghai, machine manufacturing, 200304: 83-86.

Google Scholar

[6] Wang Xiulun, Yu Xiaoyang, Huang Yongsheng: Similar manufacturing and applied research [J] Dalian: Journal of Dalian Railway Institute, 2005, (1): 60-64.

Google Scholar