As information collection change with the events development in the situations of the emergency, a mathematical model is established on the basis of it, the emergency decision-makers take different measures at different times of emergencies is analyzed in detail to get the future demand for emergency resources information , then the optimal resource scheduling scheme was arrived. Finally, the method of how to use the model to generate the best scheduling plans is given by a specific example.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1550-1553

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Xie Lan, Zhang Qiang, Zhong Kai-bin. Crisis Management . Bei Jing: Tsinghua Press, (2003).

Google Scholar

[2] Ji Lei, Chi Hong, Chen An. Emergency Management . Beijing:Higher Education Press,(2006).

Google Scholar

[3] Wang zeke.Introduction to game theory . Beijing:Renmin University of China Press,(2005).

Google Scholar

[4] Gerardi D, Myerson R B. Sequential equilibria in Bayesian games with communication . Games and Economic Behavior, 2007, 60: 104.

DOI: 10.1016/j.geb.2006.09.006

Google Scholar

[5] Zhang Yun-long, Liu Mao, Li Jian-feng. The Application of Fuzzy Group Decision Method to the Decision—making of Emergency. China Safety Science Journal, 2009, 19(2): 33-37.

Google Scholar

[6] Yu Hui, Chen Jian. When to Activate Contingency Plans within Disruptive Incidens[J]. Systems Engineering Theory and Practice . 2007, 8(8): 27-31.

Google Scholar

[7] Yang Ji-jun, Wu Qi-di, Cheng Yan, Xu Wei-sheng. Contingency Plans of Unconventional Emergency Based on Sequential Decision—making. Journal of TongJi University, 2010,38(4).

Google Scholar