Study on Scheduling Method for Reentrant Autoclave Moulding Operation of Composite Materials

Article Preview

Abstract:

The autoclave moulding process of composites is characterized by reentrance, capacity and time constraints. Its scheduling directly affects productivity and production cycle of composites. Scheduling methods in the existing literature can't meet the requirements of its scheduling optimization. Aiming at improving utilization and reducing energy consumption of autoclave, based on the Theory of Constraints, a heuristic algorithm considering the capacity and time constraints is proposed to solve the scheduling problem, and priority scheduling rules are established. The studying of a case shows the effectiveness of the algorithm.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

14-18

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] P. R. Kumar: Queueing Systems, Vol. 13(1993), p.87.

Google Scholar

[2] P. R. Kumar and S. P. Meyn: IEEE Trans. Neural Networks, Vol. 4(1995), p.251.

Google Scholar

[3] J. M. Harrison, in: Stochastic Differential Systems, Stochastic Control Theory and Applications, Springer New York, (1988), p.147.

Google Scholar

[4] J. Y. Choi and S. A. Reveliotis: IEEE Trans. on Robotics and Automation, Vol. 19(2003), p.474.

Google Scholar

[5] D. Y. Lee: IEEE Trans. on Robotics and Automation, Vol. 10(1994), p.123.

Google Scholar

[6] H. M. Cho, S. J. Bae, J. W. Kim and I. J. Jeong: Computers & Industrial Engineering, Vol. 61(2011), p.529.

Google Scholar

[7] G. Q. Zhang and Z. Y. Mei: Aeronautical Manufacturing Technology, Vol. 9 (2010), p.68.

Google Scholar

[8] B. Wang and W. H. Ye: Manufacture Information Engineering of China, Vol. 11(2011), p.56.

Google Scholar