Preliminary Investigation and Design Considerations for the Rehabilitation of Trash Screen at Jor Reservoir Low Level Outlet

Article Preview

Abstract:

Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing and inspection on the reservoir outlet revealed that the trash screen located at upstream of reservoir outlet had been damaged and dislodged creating a large opening at the trash screen thus permitting entry of larger logs which blocks the passage of water through the reservoir outlet. Bathymetric survey showed the total height of sediment deposition above the reservoir outlet covering the trash screen was estimated at approximately 13 m. The sediment volume estimated to be cleared from above the reservoir outlet area is 15,000 m3. Soil investigation conducted shows that the sediments deposited within the reservoir exhibits various different profile and characteristics. The average sediment distribution at deeper depths closer to the trash screen was found to be of 27% clay, 26% silt, 43% sand and 4% gravel. The rehabilitation works on structure as the low level outlet serves as an important feature for reservoir sedimentation management as well as for safe flood discharge release as designed for the dam. It is important that the function of the reservoir outlet structure is maintained in accordance to the International Dam Safety Standards.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

128-132

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Batang Padang Hydro-Electric Scheme, Operating And Maintenance Recommendations, Civil Engineering Structures, Preece, Cardew and Rider, (1968).

Google Scholar

[2] Cameron Highlands and Batang Padang Hydro-Electric Rehabilitation Project – Flood Study for Ringlet Reservoir, SNC-Lavalin Power, April (2002).

Google Scholar

[3] Jansen, L. Jor reservoir drawdown, safety measures, procedures and challenges, Cameron Highlands and Batang Padang Hydroelectric Scheme, International Conference on Construction and Building Technology, ICCBT (2008).

Google Scholar

[4] Cameron Highlands And Batang Padang Hydro-Electric Rehabilitation Project – Hydraulic Impact of Shutdown of Sultan Idris II Woh Power Station on Batang Padang River, Safety Measures and Flow Regulation Procedures SNC-Lavalin Power. (2006).

Google Scholar