The Application of Bayesian Statistics in Calculating Project Buffer

Article Preview

Abstract:

This paper reviews several current methods of calculating buffer on the basis of pointing out each merits and pitfalls and then introduces Bayesian statistical approach to CCS / BM domain to calculate the size of the project buffer, to overcome that the current method of the buffer calculation is too subjective and the defect on lacking of practical application. In Crystal Ball, we compare the simulation results of implementation process on the benchmark of C&PM, RESM and SM. The results show that the buffer using this method can ensure the stability of the project’s completion probability, and this method has great flexibility.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1018-1024

Citation:

Online since:

June 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] W. Herroelen. R. Leus and E. Demeulemeester: Critical Chain Project Scheduling: Do Not Oversimplify. Project Management Journal (2002), pp.48-59.

DOI: 10.1177/875697280203300406

Google Scholar

[2] O.I. Tukel, W.O. Rom and S.D. Eksioglu: An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling. European of Operation. Vol. 172(2006), pp.401-416.

DOI: 10.1016/j.ejor.2004.10.019

Google Scholar

[3] S.V. Vonder, E. Demeulemeester and W. Herroelen et al: The Use of Buffers in Project Management: The Trade-off between Stability and Makespan. International journal of production economics. Vol. 97 (2005), pp.227-240.

DOI: 10.1016/j.ijpe.2004.08.004

Google Scholar

[4] W. Herroelen and R. Leus: On the Merits and Pitfalls of Critical Chain Scheduling. Journal of Operations Management, Vol 19(2001), pp.559-577.

DOI: 10.1016/s0272-6963(01)00054-7

Google Scholar

[5] L.P. Leach: Critical Chain Project Management Improves Project Performanced. Advanced projects institute, Vol 30(1997), pp.39-51.

Google Scholar

[6] Linxi LIU, Shiqi LI, Xiabao HUANG and Tao PENG: A Buffer Sizing Approach in Critical Chain Scheduling with Attributes Dependent. Industrial Engineering and Management, Vol 1(2009), pp.11-14.

Google Scholar

[7] K. Hoel and S.G. Taylor: Quantifying Buffers for Project Schedules. Production and inventory management. Vol. 40(1999), pp.43-47.

Google Scholar

[8] Miaosong MAO: Bayesian Statistics, edited by China Statistics Press, Beijing (1999).

Google Scholar