Research on Movement and Deformation Rules of Rock Strata between Coal Seams in Caving Method Upward Mining of Left-Over Coal with Numerical Simulation Method

Article Preview

Abstract:

In this paper, the process of upward mining in Baijiazhuang mine is analyzed by the simulation function in FLAC-3D software. Basing on the actual drilling column of the upward mining face in Baijiazhuang mine, the variation of rock pressure before and after upward mining is calculated and analyzed by means of numerical simulation model, and then the deformation and movement of the rock strata between coal seams before and after mining the upper and lower coal are further studied. Finally, the simulation results of studying the rock layer’s mechanical relationship and deformation condition is the same with actual mining.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1188-1193

Citation:

Online since:

June 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] XIE He-ping, ZHOU Hong-wei, WANG Jin-an. Application of FLAC to Predict Gound Surface Displacements due to Coal Extraction and Its Comparative Analysis[J]. Chinese Journal of Rock Mechanics and Engineering, 1999 (4) : 397-401. (in Chinese).

Google Scholar

[2] WANG Xi-bao, LI Tian-bin, XU Yong. A simplified method for construction of geometric model and its application in FLAC2D numerical modeling[J]. The Chinese Journal of Geological Hazard and Control, 2008, 9 (3) : 82-85. (in Chinese).

Google Scholar

[3] JIANG Jian-ping, GAO Guang-yun. Analysis of non-uniform settlement at the ground induced by underground engineering[J]. Journal of China Coal Society, 2003, 28(3) : 225-229. (in Chinese).

Google Scholar

[4] LI Li-bo, LAI Xin-ping, LI Yu-min, LIN Hong-mei. Monitoring of the deformation and surrounding stress of a roadway under broken rock mass environment[J]. Journal of Xi'an University of Science and Technology, 2010, 30(1) : 24-28. (in Chinese).

Google Scholar

[5] XIAO Tong-qiang, FAN Ke-gong. A scending Mining of Overlying Strata's Moving Rule and Capable Research[J]. Coal, 2007, 16(7) : 7-10(in Chinese).

Google Scholar

[6] FENG Guo-rui, YAN Yong-gan,YANG Shuang-suo, ZHANG Bai-sheng, ZHAI Ying-da, KANG Li-xun. Analysis on the damage zone of overlying strata and safety layer distance on the upward mining above the longwall goaf[J]. Journal of China Coal Society, 2009, 34(8) : 1032-1036. (in Chinese).

Google Scholar

[7] FENG Guo-rui,YAN Xu,WANG Xian-xia,KANG Li-xun,ZHAI Ying-da,Determination of key positions of strata controlling in rocks between coal seams for upward mining[J]. Chinese Journal of Rock Mechanics and Engineering , 2009, 28(supp. 2) : 3721-3726(in Chinese).

Google Scholar

[8] XU Jia-lin, QIAN Ming-gao. Method to distinguish key strata in overburden[J]. Journal of China University of Mining and Technology, 2000, 29 (5): 463-467.

Google Scholar

[9] FENG Guo-rui. Study on the theory and its application of the upward mining of the left-over coal [Ph.D. Thesis] [D]. Taiyuan: Taiyuan University of Technology,2009. (in Chinese).

Google Scholar

[10] HAN Wan-lin,WANG Li-quan,ZHOU Jin-feng. Observation and investigation of ascending mining of seams in Pindingshan mine No. 4[J]. Journal of China Coal Society,1998, 23(3): 267–270. (in Chinese).

Google Scholar

[11] MA Li-qiang,WANG Li-quan,QIAO Jing-li,et al. Study of ascending mining of short-range-seams in Pingdingshan coal mine No. 4[J]. Journal of Mining and Safety Engineering,2008,25(3): 357–360. (in Chinese).

Google Scholar

[12] Xishan Coal Electricity Group Company of Shanxi Coking Coal Group, Taiyuan University of Technology. Research report on mining No·6 coal above the longwall goaf in Baijiazhuang Mine [R]. Taiyuan: Taiyuan University of Technology, 2006. (in Chinese).

DOI: 10.5614/j.eng.technol.sci.2016.48.3.2

Google Scholar